{"title":"在实际SCADA自动化系统中对HMI交付测量的精度评价","authors":"H. Khazaei Targhi, H. Sheisi, H. Moradmand","doi":"10.1109/ICA.2011.6130172","DOIUrl":null,"url":null,"abstract":"Data transmission between RTUs (Remote Terminal Unit) and HMI at control center in SCADA (Supervisory Control And Data Acquisition) automation system is accompanying with delays due to several reasons such as: limitation in data transmission rate, distance between RTU and control center, traffic of communication network and the time needed for data modulation and processing. These delays can cause errors in delivered measurements to the HMI at control center. This paper evaluates how these communication delays can affect the accuracy of transmitted measurements as viewed by HMI in automation system of a real power distribution network. Experimental measuring has been performed to obtain the time delays in data exchange between RTU and HMI. A stochastic model, based on the obtained experimental results, is then employed to model the data transmission delay for that real automation system of power network. It will be shown how the accuracy of delivered measurements to HMI will change depending on the change rate in power network conditions when there are delays in data transmission network of the SCADA automation system.","PeriodicalId":132474,"journal":{"name":"2011 2nd International Conference on Instrumentation Control and Automation","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Accuracy evaluation of delivered measurements to HMI in a real SCADA automation system\",\"authors\":\"H. Khazaei Targhi, H. Sheisi, H. Moradmand\",\"doi\":\"10.1109/ICA.2011.6130172\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Data transmission between RTUs (Remote Terminal Unit) and HMI at control center in SCADA (Supervisory Control And Data Acquisition) automation system is accompanying with delays due to several reasons such as: limitation in data transmission rate, distance between RTU and control center, traffic of communication network and the time needed for data modulation and processing. These delays can cause errors in delivered measurements to the HMI at control center. This paper evaluates how these communication delays can affect the accuracy of transmitted measurements as viewed by HMI in automation system of a real power distribution network. Experimental measuring has been performed to obtain the time delays in data exchange between RTU and HMI. A stochastic model, based on the obtained experimental results, is then employed to model the data transmission delay for that real automation system of power network. It will be shown how the accuracy of delivered measurements to HMI will change depending on the change rate in power network conditions when there are delays in data transmission network of the SCADA automation system.\",\"PeriodicalId\":132474,\"journal\":{\"name\":\"2011 2nd International Conference on Instrumentation Control and Automation\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 2nd International Conference on Instrumentation Control and Automation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICA.2011.6130172\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd International Conference on Instrumentation Control and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICA.2011.6130172","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在SCADA (Supervisory control and Data Acquisition)自动化系统中,由于数据传输速率的限制、RTU与控制中心之间的距离、通信网络的流量以及数据调制和处理所需的时间等原因,RTU与控制中心HMI之间的数据传输存在一定的延迟。这些延迟可能导致在向控制中心的HMI交付测量结果时出现错误。本文评估了在实际配电网自动化系统中,这些通信延迟对HMI传输测量精度的影响。实验测量了RTU和HMI之间数据交换的时延。在实验结果的基础上,采用随机模型对实际电网自动化系统的数据传输时延进行建模。当SCADA自动化系统的数据传输网络存在延迟时,交付给HMI的测量结果的准确性将如何根据电网条件的变化率而变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Accuracy evaluation of delivered measurements to HMI in a real SCADA automation system
Data transmission between RTUs (Remote Terminal Unit) and HMI at control center in SCADA (Supervisory Control And Data Acquisition) automation system is accompanying with delays due to several reasons such as: limitation in data transmission rate, distance between RTU and control center, traffic of communication network and the time needed for data modulation and processing. These delays can cause errors in delivered measurements to the HMI at control center. This paper evaluates how these communication delays can affect the accuracy of transmitted measurements as viewed by HMI in automation system of a real power distribution network. Experimental measuring has been performed to obtain the time delays in data exchange between RTU and HMI. A stochastic model, based on the obtained experimental results, is then employed to model the data transmission delay for that real automation system of power network. It will be shown how the accuracy of delivered measurements to HMI will change depending on the change rate in power network conditions when there are delays in data transmission network of the SCADA automation system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信