航路到达计量环境下空中交通动态路由的实验室评价

D. Isaacson, M. Hayashi, Chester Gong, Huabin Tang, Gregory L. Wong
{"title":"航路到达计量环境下空中交通动态路由的实验室评价","authors":"D. Isaacson, M. Hayashi, Chester Gong, Huabin Tang, Gregory L. Wong","doi":"10.2514/6.2018-3985","DOIUrl":null,"url":null,"abstract":"Arrival air traffic operations in the presence of convective weather are subject to uncertainty in aircraft routing and subsequently in flight trajectory predictability. Current management of arrival operations in weather-impacted airspace results in significant flight delay and suspension of arrival metering operations. The Dynamic Routing for Arrivals in Weather (DRAW) concept provides flight route amendment advisories to Traffic Management Coordinators to mitigate the impacts of convective weather on arrival operations. DRAW provides both weather conflict and schedule information for proposed route amendments, allowing air traffic managers to simultaneously evaluate weather avoidance routing and potential schedule and delay impacts. Subject matter experts consisting of retired Traffic Management Coordinators and retired Sector Controllers with arrival metering experience participated in a simulation study of Fort Worth Air Route Traffic Control Center arrival operations. Data were collected for Traffic Management Coordinator and Sector Controller participants over three weeks of simulation activities in October, 2017. Traffic Management Coordinators reported acceptable workload levels, a positive impact on their ability to manage arrival traffic while using DRAW, and initiated weather mitigation reroutes earlier while using DRAW. Sector Controllers also reported acceptable workload levels while using DRAW.","PeriodicalId":229151,"journal":{"name":"2018 Aviation Technology, Integration, and Operations Conference","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Laboratory Evaluation of Dynamic Routing of Air Traffic in a En Route Arrival Metering Environment\",\"authors\":\"D. Isaacson, M. Hayashi, Chester Gong, Huabin Tang, Gregory L. Wong\",\"doi\":\"10.2514/6.2018-3985\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Arrival air traffic operations in the presence of convective weather are subject to uncertainty in aircraft routing and subsequently in flight trajectory predictability. Current management of arrival operations in weather-impacted airspace results in significant flight delay and suspension of arrival metering operations. The Dynamic Routing for Arrivals in Weather (DRAW) concept provides flight route amendment advisories to Traffic Management Coordinators to mitigate the impacts of convective weather on arrival operations. DRAW provides both weather conflict and schedule information for proposed route amendments, allowing air traffic managers to simultaneously evaluate weather avoidance routing and potential schedule and delay impacts. Subject matter experts consisting of retired Traffic Management Coordinators and retired Sector Controllers with arrival metering experience participated in a simulation study of Fort Worth Air Route Traffic Control Center arrival operations. Data were collected for Traffic Management Coordinator and Sector Controller participants over three weeks of simulation activities in October, 2017. Traffic Management Coordinators reported acceptable workload levels, a positive impact on their ability to manage arrival traffic while using DRAW, and initiated weather mitigation reroutes earlier while using DRAW. Sector Controllers also reported acceptable workload levels while using DRAW.\",\"PeriodicalId\":229151,\"journal\":{\"name\":\"2018 Aviation Technology, Integration, and Operations Conference\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 Aviation Technology, Integration, and Operations Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2514/6.2018-3985\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Aviation Technology, Integration, and Operations Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2514/6.2018-3985","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在有对流天气的情况下,到达的空中交通作业受到飞机路线和随后的飞行轨迹可预测性的不确定性的影响。目前在受天气影响空域的抵港业务管理导致航班严重延误和抵港计量业务暂停。天气下的动态抵港航线(DRAW)概念向交通管理协调员提供航线修订建议,以减轻对流天气对抵港作业的影响。DRAW为建议的航线修改提供天气冲突和时间表信息,允许空中交通管理人员同时评估天气规避路线和潜在的时间表和延误影响。由具有到达计量经验的退休交通管理协调员和退休扇区管制员组成的主题专家参加了沃斯堡航空路线交通管制中心到达操作的模拟研究。在2017年10月为期三周的模拟活动中,为交通管理协调员和部门控制器参与者收集了数据。交通管理协调员报告了可接受的工作量水平,这对他们在使用DRAW时管理到达交通的能力产生了积极影响,并在使用DRAW时更早地启动了天气缓解路线。扇区控制器在使用DRAW时也报告可接受的工作负载水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Laboratory Evaluation of Dynamic Routing of Air Traffic in a En Route Arrival Metering Environment
Arrival air traffic operations in the presence of convective weather are subject to uncertainty in aircraft routing and subsequently in flight trajectory predictability. Current management of arrival operations in weather-impacted airspace results in significant flight delay and suspension of arrival metering operations. The Dynamic Routing for Arrivals in Weather (DRAW) concept provides flight route amendment advisories to Traffic Management Coordinators to mitigate the impacts of convective weather on arrival operations. DRAW provides both weather conflict and schedule information for proposed route amendments, allowing air traffic managers to simultaneously evaluate weather avoidance routing and potential schedule and delay impacts. Subject matter experts consisting of retired Traffic Management Coordinators and retired Sector Controllers with arrival metering experience participated in a simulation study of Fort Worth Air Route Traffic Control Center arrival operations. Data were collected for Traffic Management Coordinator and Sector Controller participants over three weeks of simulation activities in October, 2017. Traffic Management Coordinators reported acceptable workload levels, a positive impact on their ability to manage arrival traffic while using DRAW, and initiated weather mitigation reroutes earlier while using DRAW. Sector Controllers also reported acceptable workload levels while using DRAW.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信