印度基础设施项目延误的原因和建议改进。

{"title":"印度基础设施项目延误的原因和建议改进。","authors":"","doi":"10.29121/ijesrt.v10.i1.2021.4","DOIUrl":null,"url":null,"abstract":"These days delay in development are the most significant issue in construction industry in India. It is second biggest industry after agriculture in India for the improvement of an economy. Delay in development projects is considered one of the most common issues causing a large number of negative impacts on the development projects. Construction delays can be minimized just when their cause are distinguished. The goal of this investigation was to identify the major reasons for construction delays. It is consistently helpful that a Project complete on time effectively. Unfortunately because of different reasons, enormous number of development projects fails to follow the arranged schedule and hence delayed in project. This paper presents the reasons for delay occurring on a progressing bridge construction project a case study.","PeriodicalId":320722,"journal":{"name":"January-2021","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"CAUSES OF DELAY AND SUGGESTED IMPROVEMENT IN INFRASTRUCTURE PROJECT IN INDIA.\",\"authors\":\"\",\"doi\":\"10.29121/ijesrt.v10.i1.2021.4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"These days delay in development are the most significant issue in construction industry in India. It is second biggest industry after agriculture in India for the improvement of an economy. Delay in development projects is considered one of the most common issues causing a large number of negative impacts on the development projects. Construction delays can be minimized just when their cause are distinguished. The goal of this investigation was to identify the major reasons for construction delays. It is consistently helpful that a Project complete on time effectively. Unfortunately because of different reasons, enormous number of development projects fails to follow the arranged schedule and hence delayed in project. This paper presents the reasons for delay occurring on a progressing bridge construction project a case study.\",\"PeriodicalId\":320722,\"journal\":{\"name\":\"January-2021\",\"volume\":\"110 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"January-2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29121/ijesrt.v10.i1.2021.4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"January-2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29121/ijesrt.v10.i1.2021.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

如今,印度建筑业的最大问题是发展滞后。它是印度仅次于农业的第二大产业。开发项目的延迟被认为是最常见的问题之一,对开发项目造成了大量的负面影响。只有找出原因,才能最大限度地减少施工延误。这项调查的目的是确定施工延误的主要原因。按时有效地完成一个项目总是很有帮助的。不幸的是,由于不同的原因,大量的开发项目未能按照安排的时间表进行,从而导致项目延误。本文以某在建桥梁工程为例,分析了工程延误的原因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
CAUSES OF DELAY AND SUGGESTED IMPROVEMENT IN INFRASTRUCTURE PROJECT IN INDIA.
These days delay in development are the most significant issue in construction industry in India. It is second biggest industry after agriculture in India for the improvement of an economy. Delay in development projects is considered one of the most common issues causing a large number of negative impacts on the development projects. Construction delays can be minimized just when their cause are distinguished. The goal of this investigation was to identify the major reasons for construction delays. It is consistently helpful that a Project complete on time effectively. Unfortunately because of different reasons, enormous number of development projects fails to follow the arranged schedule and hence delayed in project. This paper presents the reasons for delay occurring on a progressing bridge construction project a case study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信