{"title":"在能源和辅助服务市场中为水力发电厂提供决策支持系统","authors":"Željko Štefan, M. Brezovec, Dusan Mundar","doi":"10.1109/EEM.2011.5953052","DOIUrl":null,"url":null,"abstract":"This paper analyses solutions for optimal bidding for hydro units operating in simultaneous markets for energy and ancillary services and decision making process for plant refurbishment and generating capacity upgrade. Methodology based on the Decision Theory will be applied to identify the optimal solutions which minimize the expected costs and the related risks. The proposed methodology will be demonstrated for a real hydropower plant in Croatia (Varazdin HPP) which will be refurbished.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A decision support system for hydro power plants in markets for energy and ancillary services\",\"authors\":\"Željko Štefan, M. Brezovec, Dusan Mundar\",\"doi\":\"10.1109/EEM.2011.5953052\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper analyses solutions for optimal bidding for hydro units operating in simultaneous markets for energy and ancillary services and decision making process for plant refurbishment and generating capacity upgrade. Methodology based on the Decision Theory will be applied to identify the optimal solutions which minimize the expected costs and the related risks. The proposed methodology will be demonstrated for a real hydropower plant in Croatia (Varazdin HPP) which will be refurbished.\",\"PeriodicalId\":143375,\"journal\":{\"name\":\"2011 8th International Conference on the European Energy Market (EEM)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 8th International Conference on the European Energy Market (EEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2011.5953052\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5953052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A decision support system for hydro power plants in markets for energy and ancillary services
This paper analyses solutions for optimal bidding for hydro units operating in simultaneous markets for energy and ancillary services and decision making process for plant refurbishment and generating capacity upgrade. Methodology based on the Decision Theory will be applied to identify the optimal solutions which minimize the expected costs and the related risks. The proposed methodology will be demonstrated for a real hydropower plant in Croatia (Varazdin HPP) which will be refurbished.