{"title":"基于Fmea方法的物流作业风险识别与评价","authors":"Yunia Dwie Nurcahyanie, A. Cahyono","doi":"10.34306/att.v5i1sp.306","DOIUrl":null,"url":null,"abstract":"The purpose of this study is to identify risks to operational factors in PT. XZY identifies and formulates existing handlers in PT. XZY related to risks to work operations. This study used the FMEA method. FMEA is a method used to perform analysis inductively, carried out repeatedly and systematically so that the process can be documented.  Data was obtained using direct observation and interviews with logistics workers. Based on the results of problem identification and fmea calculation results, 19 operational risks were obtained in the logistics department of PT. XZY and varying RPN values, with the smallest value being 12 and the largest value being 729. Thus, it is concluded that the 3 highest risks in operations that can hinder work activities are limited product storage, improper placement of spare parts, and input errors in the system","PeriodicalId":143921,"journal":{"name":"Aptisi Transactions on Technopreneurship (ATT)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-02-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Identification and Evaluation of Logistics Operational Risk Using the Fmea Method at PT. XZY\",\"authors\":\"Yunia Dwie Nurcahyanie, A. Cahyono\",\"doi\":\"10.34306/att.v5i1sp.306\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this study is to identify risks to operational factors in PT. XZY identifies and formulates existing handlers in PT. XZY related to risks to work operations. This study used the FMEA method. FMEA is a method used to perform analysis inductively, carried out repeatedly and systematically so that the process can be documented.  Data was obtained using direct observation and interviews with logistics workers. Based on the results of problem identification and fmea calculation results, 19 operational risks were obtained in the logistics department of PT. XZY and varying RPN values, with the smallest value being 12 and the largest value being 729. Thus, it is concluded that the 3 highest risks in operations that can hinder work activities are limited product storage, improper placement of spare parts, and input errors in the system\",\"PeriodicalId\":143921,\"journal\":{\"name\":\"Aptisi Transactions on Technopreneurship (ATT)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Aptisi Transactions on Technopreneurship (ATT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34306/att.v5i1sp.306\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aptisi Transactions on Technopreneurship (ATT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34306/att.v5i1sp.306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

本研究的目的是识别PT作业因素的风险。XZY识别并制定了XZY PT中与作业风险相关的现有处理程序。本研究采用FMEA方法。FMEA是一种用于进行归纳分析的方法,该方法可重复和系统地进行,以便将过程记录下来。数据是通过直接观察和对物流工人的访谈获得的。根据问题识别结果和fmea计算结果,XZY PT. XZY物流部门在不同RPN值下得到19个操作风险,最小值为12,最大值为729。因此,可以得出结论,操作中阻碍工作活动的3个最高风险是有限的产品存储,备件放置不当和系统输入错误
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Identification and Evaluation of Logistics Operational Risk Using the Fmea Method at PT. XZY
The purpose of this study is to identify risks to operational factors in PT. XZY identifies and formulates existing handlers in PT. XZY related to risks to work operations. This study used the FMEA method. FMEA is a method used to perform analysis inductively, carried out repeatedly and systematically so that the process can be documented.  Data was obtained using direct observation and interviews with logistics workers. Based on the results of problem identification and fmea calculation results, 19 operational risks were obtained in the logistics department of PT. XZY and varying RPN values, with the smallest value being 12 and the largest value being 729. Thus, it is concluded that the 3 highest risks in operations that can hinder work activities are limited product storage, improper placement of spare parts, and input errors in the system
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.20
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信