{"title":"开发过程的执行-检查-行动子周期模型","authors":"S. Nanu, A. Nanu, T. Dragomir, Lavinia-Elena Dragomir","doi":"10.1109/SACI.2011.5873057","DOIUrl":null,"url":null,"abstract":"The development process is a part of the lifecycle of a product. For a project manager it is important to design the process in an efficient manner from the point of view of human resource yield. This can be done by an objective approach based on parameterizations. To perform this easily, and to verify the configuration versions for tasks, the project manager is in need for flexible tools. This paper presents the kernel elements of a tool usable in assistanting the project manager. Elements like developer and reviewer that are modeled as hybrid systems, containing both continuous time parts and finite states subsystems, are used. Two case studies illustrate the manner of work and obtained results.","PeriodicalId":334381,"journal":{"name":"2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)","volume":"86 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Models for do-check-act subcycle for development processes\",\"authors\":\"S. Nanu, A. Nanu, T. Dragomir, Lavinia-Elena Dragomir\",\"doi\":\"10.1109/SACI.2011.5873057\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development process is a part of the lifecycle of a product. For a project manager it is important to design the process in an efficient manner from the point of view of human resource yield. This can be done by an objective approach based on parameterizations. To perform this easily, and to verify the configuration versions for tasks, the project manager is in need for flexible tools. This paper presents the kernel elements of a tool usable in assistanting the project manager. Elements like developer and reviewer that are modeled as hybrid systems, containing both continuous time parts and finite states subsystems, are used. Two case studies illustrate the manner of work and obtained results.\",\"PeriodicalId\":334381,\"journal\":{\"name\":\"2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)\",\"volume\":\"86 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SACI.2011.5873057\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SACI.2011.5873057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

开发过程是产品生命周期的一部分。对于项目经理来说,从人力资源产出的角度出发,以一种有效的方式设计过程是很重要的。这可以通过基于参数化的客观方法来实现。为了轻松地执行此操作,并验证任务的配置版本,项目经理需要灵活的工具。本文介绍了一个可用于协助项目经理的工具的核心要素。使用了像developer和reviewer这样的元素,它们被建模为混合系统,包含连续时间部分和有限状态子系统。两个案例研究说明了工作方式和取得的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Models for do-check-act subcycle for development processes
The development process is a part of the lifecycle of a product. For a project manager it is important to design the process in an efficient manner from the point of view of human resource yield. This can be done by an objective approach based on parameterizations. To perform this easily, and to verify the configuration versions for tasks, the project manager is in need for flexible tools. This paper presents the kernel elements of a tool usable in assistanting the project manager. Elements like developer and reviewer that are modeled as hybrid systems, containing both continuous time parts and finite states subsystems, are used. Two case studies illustrate the manner of work and obtained results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信