管理多腔工具生产率

B. Auches, G. Grewal, P. Silverman
{"title":"管理多腔工具生产率","authors":"B. Auches, G. Grewal, P. Silverman","doi":"10.1109/ASMC.1995.484379","DOIUrl":null,"url":null,"abstract":"Multi-chamber tools have enabled significant technical breakthroughs in wafer processing in the last decade. Expenditures for these tools are increasing as a percentage of the total capital base. Fully one-third of the capital dollars invested in 0.4 /spl mu/m technology processing equipment will be spent on multi-chamber tools. These tools also present some special productivity problems, as a significant portion of the tool can fail to produce wafers while the remaining portions of the tool still are able to do so at a reduced run rate. Classical measures of tool availability and run rates are insufficient to account for reduced output when part of the tool is down. This paper presents measurements, operating scenarios and operating guidelines to maximize multi-chamber tool productivity in a volume manufacturing environment.","PeriodicalId":237741,"journal":{"name":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Managing multi-chamber tool productivity\",\"authors\":\"B. Auches, G. Grewal, P. Silverman\",\"doi\":\"10.1109/ASMC.1995.484379\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Multi-chamber tools have enabled significant technical breakthroughs in wafer processing in the last decade. Expenditures for these tools are increasing as a percentage of the total capital base. Fully one-third of the capital dollars invested in 0.4 /spl mu/m technology processing equipment will be spent on multi-chamber tools. These tools also present some special productivity problems, as a significant portion of the tool can fail to produce wafers while the remaining portions of the tool still are able to do so at a reduced run rate. Classical measures of tool availability and run rates are insufficient to account for reduced output when part of the tool is down. This paper presents measurements, operating scenarios and operating guidelines to maximize multi-chamber tool productivity in a volume manufacturing environment.\",\"PeriodicalId\":237741,\"journal\":{\"name\":\"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-11-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.1995.484379\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.1995.484379","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在过去的十年里,多腔工具在晶圆加工方面取得了重大的技术突破。这些工具的支出占总资本基础的百分比正在增加。投资于0.4 /spl亩/m工艺加工设备的全部资金的三分之一将用于多室工具。这些工具也存在一些特殊的生产率问题,因为工具的很大一部分可能无法生产晶圆,而工具的其余部分仍然能够以较低的运行速率生产晶圆。当工具的一部分出现故障时,传统的工具可用性和运行速率的度量不足以解释减少的输出。本文提出了测量,操作场景和操作指南,以最大限度地提高多腔工具的生产力在批量制造环境。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Managing multi-chamber tool productivity
Multi-chamber tools have enabled significant technical breakthroughs in wafer processing in the last decade. Expenditures for these tools are increasing as a percentage of the total capital base. Fully one-third of the capital dollars invested in 0.4 /spl mu/m technology processing equipment will be spent on multi-chamber tools. These tools also present some special productivity problems, as a significant portion of the tool can fail to produce wafers while the remaining portions of the tool still are able to do so at a reduced run rate. Classical measures of tool availability and run rates are insufficient to account for reduced output when part of the tool is down. This paper presents measurements, operating scenarios and operating guidelines to maximize multi-chamber tool productivity in a volume manufacturing environment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信