模拟辅助楼宇控制系统的半自动化部署

Sergio Leal, Florian Dubisch, Florian Stift, G. Zucker, P. Palensky
{"title":"模拟辅助楼宇控制系统的半自动化部署","authors":"Sergio Leal, Florian Dubisch, Florian Stift, G. Zucker, P. Palensky","doi":"10.1109/IECON.2013.6700076","DOIUrl":null,"url":null,"abstract":"The deployment of Simulation-aided Building Controls is a complex process due to the uniqueness of each building along with an increasing complexity of building systems. Typically the deployment tasks are performed manually by highly specialized personnel which results in a poorly documented and extremely scattered deployment process. This paper introduces a workflow for the deployment of a Simulation-aided Building Control service suitable for supporting the operation phase of a building. Some tasks in the deployment process may benefit from machine support, especially data intensive, repetitive and error prone tasks. These may be fully or semi-automated. The proposed approach reduces the complexity of the setup procedure, decreases problems related to the uniqueness of the infrastructure and supports the documentation of the deployment process. Specially large facility management service providers may profit from this deployment process.","PeriodicalId":237327,"journal":{"name":"IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Semi-automated deployment of Simulation-aided Building Controls\",\"authors\":\"Sergio Leal, Florian Dubisch, Florian Stift, G. Zucker, P. Palensky\",\"doi\":\"10.1109/IECON.2013.6700076\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The deployment of Simulation-aided Building Controls is a complex process due to the uniqueness of each building along with an increasing complexity of building systems. Typically the deployment tasks are performed manually by highly specialized personnel which results in a poorly documented and extremely scattered deployment process. This paper introduces a workflow for the deployment of a Simulation-aided Building Control service suitable for supporting the operation phase of a building. Some tasks in the deployment process may benefit from machine support, especially data intensive, repetitive and error prone tasks. These may be fully or semi-automated. The proposed approach reduces the complexity of the setup procedure, decreases problems related to the uniqueness of the infrastructure and supports the documentation of the deployment process. Specially large facility management service providers may profit from this deployment process.\",\"PeriodicalId\":237327,\"journal\":{\"name\":\"IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IECON.2013.6700076\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IECON 2013 - 39th Annual Conference of the IEEE Industrial Electronics Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IECON.2013.6700076","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

由于每个建筑物的独特性以及建筑物系统的复杂性日益增加,模拟辅助建筑物控制的部署是一个复杂的过程。通常,部署任务是由高度专业化的人员手动执行的,这导致文档编制不良,部署过程极其分散。本文介绍了一种适用于支持建筑物运行阶段的仿真辅助楼宇控制服务的部署工作流程。部署过程中的某些任务可能受益于机器支持,特别是数据密集型、重复性和易出错的任务。这些可能是完全或半自动化的。所提出的方法降低了设置过程的复杂性,减少了与基础结构唯一性相关的问题,并支持部署过程的文档化。特别是大型设施管理服务提供商可以从这个部署过程中获利。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Semi-automated deployment of Simulation-aided Building Controls
The deployment of Simulation-aided Building Controls is a complex process due to the uniqueness of each building along with an increasing complexity of building systems. Typically the deployment tasks are performed manually by highly specialized personnel which results in a poorly documented and extremely scattered deployment process. This paper introduces a workflow for the deployment of a Simulation-aided Building Control service suitable for supporting the operation phase of a building. Some tasks in the deployment process may benefit from machine support, especially data intensive, repetitive and error prone tasks. These may be fully or semi-automated. The proposed approach reduces the complexity of the setup procedure, decreases problems related to the uniqueness of the infrastructure and supports the documentation of the deployment process. Specially large facility management service providers may profit from this deployment process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信