孟买Currey路单轨桥450MT主梁成功启动

Vrushank Buch, P. Damle
{"title":"孟买Currey路单轨桥450MT主梁成功启动","authors":"Vrushank Buch, P. Damle","doi":"10.1504/IJTCS.2017.10005295","DOIUrl":null,"url":null,"abstract":"Recently in September 2015, Mumbai Metropolitan Region Development Authority (MMRDA) successfully executed a Herculean task of its project 'Mumbai Monorail'. This involved launching (erection) of 450 metric ton girder bridge above the railway tracks for the monorail in a short span of few hours. Present study analyses painstaking efforts of the project team on the sidelines of project management framework.","PeriodicalId":253960,"journal":{"name":"International Journal of Teaching and Case Studies","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Successful launch of 450MT girder for monorail bridge at Currey Road, Mumbai\",\"authors\":\"Vrushank Buch, P. Damle\",\"doi\":\"10.1504/IJTCS.2017.10005295\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recently in September 2015, Mumbai Metropolitan Region Development Authority (MMRDA) successfully executed a Herculean task of its project 'Mumbai Monorail'. This involved launching (erection) of 450 metric ton girder bridge above the railway tracks for the monorail in a short span of few hours. Present study analyses painstaking efforts of the project team on the sidelines of project management framework.\",\"PeriodicalId\":253960,\"journal\":{\"name\":\"International Journal of Teaching and Case Studies\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Teaching and Case Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJTCS.2017.10005295\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Teaching and Case Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJTCS.2017.10005295","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

最近在2015年9月,孟买大都会地区发展局(MMRDA)成功执行了其项目“孟买单轨铁路”的艰巨任务。这包括在短短几个小时内在铁路轨道上架设450公吨的单轨梁桥。本研究分析了项目团队在项目管理框架之外的艰苦努力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Successful launch of 450MT girder for monorail bridge at Currey Road, Mumbai
Recently in September 2015, Mumbai Metropolitan Region Development Authority (MMRDA) successfully executed a Herculean task of its project 'Mumbai Monorail'. This involved launching (erection) of 450 metric ton girder bridge above the railway tracks for the monorail in a short span of few hours. Present study analyses painstaking efforts of the project team on the sidelines of project management framework.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信