{"title":"孟买Currey路单轨桥450MT主梁成功启动","authors":"Vrushank Buch, P. Damle","doi":"10.1504/IJTCS.2017.10005295","DOIUrl":null,"url":null,"abstract":"Recently in September 2015, Mumbai Metropolitan Region Development Authority (MMRDA) successfully executed a Herculean task of its project 'Mumbai Monorail'. This involved launching (erection) of 450 metric ton girder bridge above the railway tracks for the monorail in a short span of few hours. Present study analyses painstaking efforts of the project team on the sidelines of project management framework.","PeriodicalId":253960,"journal":{"name":"International Journal of Teaching and Case Studies","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Successful launch of 450MT girder for monorail bridge at Currey Road, Mumbai\",\"authors\":\"Vrushank Buch, P. Damle\",\"doi\":\"10.1504/IJTCS.2017.10005295\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recently in September 2015, Mumbai Metropolitan Region Development Authority (MMRDA) successfully executed a Herculean task of its project 'Mumbai Monorail'. This involved launching (erection) of 450 metric ton girder bridge above the railway tracks for the monorail in a short span of few hours. Present study analyses painstaking efforts of the project team on the sidelines of project management framework.\",\"PeriodicalId\":253960,\"journal\":{\"name\":\"International Journal of Teaching and Case Studies\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Teaching and Case Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJTCS.2017.10005295\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Teaching and Case Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJTCS.2017.10005295","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Successful launch of 450MT girder for monorail bridge at Currey Road, Mumbai
Recently in September 2015, Mumbai Metropolitan Region Development Authority (MMRDA) successfully executed a Herculean task of its project 'Mumbai Monorail'. This involved launching (erection) of 450 metric ton girder bridge above the railway tracks for the monorail in a short span of few hours. Present study analyses painstaking efforts of the project team on the sidelines of project management framework.