{"title":"预制和现场施工之间的选择:优势选择方法","authors":"Krishna Chauhan, A. Peltokorpi, Rita Lavikka, O. Seppänen","doi":"10.24928/2019/0158","DOIUrl":null,"url":null,"abstract":"Several academic and industrial studies have documented the benefits of prefabrication compared to on-site construction. However, key construction project actors find it difficult to analyse whether prefabrication would be beneficial for their project with specific circumstances and targets. This research aims to develop a process to evaluate the impact of prefabrication in projects. First, based on the literature review and focus group discussion, we define the impact factors of prefabrication. Second, we apply Choosing by Advantage (CBA) approach together with Cost-Benefit-analysis to define a process for prefabrication impact measurement which considers various impact factors and their importance in the project. Finally, we validate the process with the industry experts. The paper contributes to knowledge on robust decision-making processes about production methods in situations in which all impact factors are not easily comparable but require a subjective valuation.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Deciding Between Prefabrication and On-Site Construction: A Choosing-by-Advantage Approach\",\"authors\":\"Krishna Chauhan, A. Peltokorpi, Rita Lavikka, O. Seppänen\",\"doi\":\"10.24928/2019/0158\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Several academic and industrial studies have documented the benefits of prefabrication compared to on-site construction. However, key construction project actors find it difficult to analyse whether prefabrication would be beneficial for their project with specific circumstances and targets. This research aims to develop a process to evaluate the impact of prefabrication in projects. First, based on the literature review and focus group discussion, we define the impact factors of prefabrication. Second, we apply Choosing by Advantage (CBA) approach together with Cost-Benefit-analysis to define a process for prefabrication impact measurement which considers various impact factors and their importance in the project. Finally, we validate the process with the industry experts. The paper contributes to knowledge on robust decision-making processes about production methods in situations in which all impact factors are not easily comparable but require a subjective valuation.\",\"PeriodicalId\":278113,\"journal\":{\"name\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2019/0158\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0158","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

一些学术和工业研究已经证明了与现场施工相比,预制的好处。然而,关键的建设项目参与者发现很难分析预制是否对他们的项目具有特定的情况和目标。本研究的目的是发展一个过程来评估预制在项目中的影响。首先,在文献回顾和焦点小组讨论的基础上,我们定义了预制的影响因素。其次,我们采用优势选择(CBA)方法和成本效益分析来定义一个预制影响测量过程,该过程考虑了各种影响因素及其在项目中的重要性。最后,我们与行业专家验证流程。本文有助于了解在所有影响因素不容易比较但需要主观评估的情况下有关生产方法的稳健决策过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Deciding Between Prefabrication and On-Site Construction: A Choosing-by-Advantage Approach
Several academic and industrial studies have documented the benefits of prefabrication compared to on-site construction. However, key construction project actors find it difficult to analyse whether prefabrication would be beneficial for their project with specific circumstances and targets. This research aims to develop a process to evaluate the impact of prefabrication in projects. First, based on the literature review and focus group discussion, we define the impact factors of prefabrication. Second, we apply Choosing by Advantage (CBA) approach together with Cost-Benefit-analysis to define a process for prefabrication impact measurement which considers various impact factors and their importance in the project. Finally, we validate the process with the industry experts. The paper contributes to knowledge on robust decision-making processes about production methods in situations in which all impact factors are not easily comparable but require a subjective valuation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信