{"title":"ANALISIS GANGGUAN PADA KWH METER PELANGGAN DI PT. PLN (PERSERO) UP3 SUMBAWA MENGGUNAKAN FISHBONE DAN PDCA (PLAN, DO, CHECK, ACTION)","authors":"Yuniar Adekayanti, I. Adiasa, Ismi Mashabai","doi":"10.36761/jitsa.v2i1.1020","DOIUrl":null,"url":null,"abstract":"Along with the rapid development of technology in the industrial world, the need for electrical energy is also increasing. PT. PLN (Persero) UP3 Sumbawa is a state-owned company (BUMN) that helps provide and deal with various electricity problems in the surrounding area. Steps taken by this company in maintaining the safety and comfort of using electrical energy is to carry out regular checks at the customer's home. However, this step is deemed ineffective because the customer may not be at home during the checking. In addition, checking manually can also cause errors when recording the KWH meter, so that this can cause losses to the customer and the company. Therefore, PT. PLN (Persero) introduced a new system, namely the Automatic MeterReading (AMR) system. With this system, companies can read KWH meters remotely and automatically so that there are no more errors in recording KWH meters. However, the use of the system must be balanced with a good communication network. Several areas in Sumbawa still have difficulties in accessing the communication network, causing several disturbances to occur in the system. With the existence of various previous problems, a research was conducted to observe the types of disturbances as well as efforts to prevent and deal with disturbances in the KWH Meter system at PT. PLN (Persero) UP3 Sumbawa uses the Fishbone and PDCA (Plan, Do, Check, Action) methods.","PeriodicalId":152856,"journal":{"name":"JURNAL INDUSTRI & TEKNOLOGI SAMAWA","volume":"54 9-10","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL INDUSTRI & TEKNOLOGI SAMAWA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36761/jitsa.v2i1.1020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

随着工业技术的快速发展,对电能的需求也在不断增加。PT. PLN (Persero) UP3 Sumbawa是一家帮助提供和处理周边地区各种电力问题的国有公司(BUMN)。为了保证使用电能的安全性和舒适性,本公司采取的措施是定期在客户家中进行检查。然而,这一步被认为是无效的,因为客户在检查期间可能不在家。另外,手工核对也会在记录电能表时出现错误,给客户和公司造成损失。因此,PT. PLN (Persero)引入了一个新系统,即自动抄表(AMR)系统。有了这个系统,公司可以远程自动读取电表,因此在记录电表时不会再出现错误。但是,系统的使用必须与良好的通信网络相平衡。松巴哇的几个地区仍然难以接入通信网络,导致系统发生了几次干扰。鉴于以往各种问题的存在,本文研究了PT. PLN (Persero) UP3 Sumbawa KWH Meter系统中干扰的类型以及预防和处理干扰的努力,采用了鱼骨和PDCA (Plan, Do, Check, Action)方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS GANGGUAN PADA KWH METER PELANGGAN DI PT. PLN (PERSERO) UP3 SUMBAWA MENGGUNAKAN FISHBONE DAN PDCA (PLAN, DO, CHECK, ACTION)
Along with the rapid development of technology in the industrial world, the need for electrical energy is also increasing. PT. PLN (Persero) UP3 Sumbawa is a state-owned company (BUMN) that helps provide and deal with various electricity problems in the surrounding area. Steps taken by this company in maintaining the safety and comfort of using electrical energy is to carry out regular checks at the customer's home. However, this step is deemed ineffective because the customer may not be at home during the checking. In addition, checking manually can also cause errors when recording the KWH meter, so that this can cause losses to the customer and the company. Therefore, PT. PLN (Persero) introduced a new system, namely the Automatic MeterReading (AMR) system. With this system, companies can read KWH meters remotely and automatically so that there are no more errors in recording KWH meters. However, the use of the system must be balanced with a good communication network. Several areas in Sumbawa still have difficulties in accessing the communication network, causing several disturbances to occur in the system. With the existence of various previous problems, a research was conducted to observe the types of disturbances as well as efforts to prevent and deal with disturbances in the KWH Meter system at PT. PLN (Persero) UP3 Sumbawa uses the Fishbone and PDCA (Plan, Do, Check, Action) methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信