{"title":"半导体制造实时调度系统中的下一队列算法","authors":"Ying-Jen Chen, G. Yu., Kuo-sung Huang, Ivan Wang","doi":"10.1109/ISSM.2000.993618","DOIUrl":null,"url":null,"abstract":"We demonstrate a next-queue rule in the real time dispatcher developed in MXIC FAB I. The outline of this system is presented first, then, the dispatching rule design logic is described. The real time dispatching system makes lot-dispatching work easy for operators. A next queue algorithm was developed in the implementation of the real time dispatcher. Finally, it has been proved that the dispatching algorithm not only improves FAB utilization but also reduces cycle time. Implementation of the real time dispatching system keeps reducing of cycle time and improves tool utilization by 7% from Q2 1999 to now.","PeriodicalId":104122,"journal":{"name":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","volume":"353 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"A next queue algorithm in real time dispatching system of semiconductor manufacturing\",\"authors\":\"Ying-Jen Chen, G. Yu., Kuo-sung Huang, Ivan Wang\",\"doi\":\"10.1109/ISSM.2000.993618\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We demonstrate a next-queue rule in the real time dispatcher developed in MXIC FAB I. The outline of this system is presented first, then, the dispatching rule design logic is described. The real time dispatching system makes lot-dispatching work easy for operators. A next queue algorithm was developed in the implementation of the real time dispatcher. Finally, it has been proved that the dispatching algorithm not only improves FAB utilization but also reduces cycle time. Implementation of the real time dispatching system keeps reducing of cycle time and improves tool utilization by 7% from Q2 1999 to now.\",\"PeriodicalId\":104122,\"journal\":{\"name\":\"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)\",\"volume\":\"353 2\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISSM.2000.993618\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2000.993618","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文首先给出了该系统的总体结构,然后描述了调度规则的设计逻辑。实时调度系统使作业人员的批量调度工作更加方便。在实时调度程序的实现中,提出了一种next队列算法。最后证明了该调度算法不仅提高了FAB利用率,而且缩短了周期时间。从1999年第二季度至今,实时调度系统的实施使周期时间不断缩短,工具利用率提高了7%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A next queue algorithm in real time dispatching system of semiconductor manufacturing
We demonstrate a next-queue rule in the real time dispatcher developed in MXIC FAB I. The outline of this system is presented first, then, the dispatching rule design logic is described. The real time dispatching system makes lot-dispatching work easy for operators. A next queue algorithm was developed in the implementation of the real time dispatcher. Finally, it has been proved that the dispatching algorithm not only improves FAB utilization but also reduces cycle time. Implementation of the real time dispatching system keeps reducing of cycle time and improves tool utilization by 7% from Q2 1999 to now.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信