使用多用途互连器到2050年实现净零排放

D. Devoy, E. Wells, R. Lodhia, M. Moran, M. Bray, C. A. Smith
{"title":"使用多用途互连器到2050年实现净零排放","authors":"D. Devoy, E. Wells, R. Lodhia, M. Moran, M. Bray, C. A. Smith","doi":"10.1049/icp.2021.2460","DOIUrl":null,"url":null,"abstract":"The Great Britain (GB) Electricity system has seen a significant increase in Offshore Wind and cross border interconnection, with over 10 GW of offshore wind and 5 GW of interconnection with Continental Europe operational as at July 2021. To meet a net zero ambition by 2050 it is suggested that an installed Offshore Wind capacity of 40 GW by 2030 and 75 GW by 2050 would need to be connected to the GB Electricity System. In addition, the Electricity System Operator indicates more than 20 GW of Interconnection would also be required. However, Wind Farms and Interconnectors are currently connected as single purpose projects to the Onshore Transmission system and continuing this arrangement will bring major permitting challenges and disruption to coastal communities. This paper proposes the use of Multi-Purpose Interconnectors to address the challenges.","PeriodicalId":347664,"journal":{"name":"The 17th International Conference on AC and DC Power Transmission (ACDC 2021)","volume":"73 10","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The use of Multi-Purpose Interconnectors to meet net zero by 2050\",\"authors\":\"D. Devoy, E. Wells, R. Lodhia, M. Moran, M. Bray, C. A. Smith\",\"doi\":\"10.1049/icp.2021.2460\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Great Britain (GB) Electricity system has seen a significant increase in Offshore Wind and cross border interconnection, with over 10 GW of offshore wind and 5 GW of interconnection with Continental Europe operational as at July 2021. To meet a net zero ambition by 2050 it is suggested that an installed Offshore Wind capacity of 40 GW by 2030 and 75 GW by 2050 would need to be connected to the GB Electricity System. In addition, the Electricity System Operator indicates more than 20 GW of Interconnection would also be required. However, Wind Farms and Interconnectors are currently connected as single purpose projects to the Onshore Transmission system and continuing this arrangement will bring major permitting challenges and disruption to coastal communities. This paper proposes the use of Multi-Purpose Interconnectors to address the challenges.\",\"PeriodicalId\":347664,\"journal\":{\"name\":\"The 17th International Conference on AC and DC Power Transmission (ACDC 2021)\",\"volume\":\"73 10\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The 17th International Conference on AC and DC Power Transmission (ACDC 2021)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/icp.2021.2460\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 17th International Conference on AC and DC Power Transmission (ACDC 2021)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/icp.2021.2460","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

截至2021年7月,英国电力系统的海上风电和跨境互联大幅增加,海上风电装机容量超过10吉瓦,与欧洲大陆的互联容量超过5吉瓦。为了实现到2050年实现净零排放的目标,建议到2030年安装40吉瓦的海上风电,到2050年安装75吉瓦的海上风电,需要连接到英国电力系统。此外,电力系统运营商表示,还需要超过20吉瓦的互联。然而,风力发电场和互连器目前作为单一用途项目连接到陆上输电系统,继续这种安排将给沿海社区带来重大的许可挑战和干扰。本文建议使用多用途互连器来解决这些挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The use of Multi-Purpose Interconnectors to meet net zero by 2050
The Great Britain (GB) Electricity system has seen a significant increase in Offshore Wind and cross border interconnection, with over 10 GW of offshore wind and 5 GW of interconnection with Continental Europe operational as at July 2021. To meet a net zero ambition by 2050 it is suggested that an installed Offshore Wind capacity of 40 GW by 2030 and 75 GW by 2050 would need to be connected to the GB Electricity System. In addition, the Electricity System Operator indicates more than 20 GW of Interconnection would also be required. However, Wind Farms and Interconnectors are currently connected as single purpose projects to the Onshore Transmission system and continuing this arrangement will bring major permitting challenges and disruption to coastal communities. This paper proposes the use of Multi-Purpose Interconnectors to address the challenges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信