Preliminary studies of a cabled water tower

E.M. To , J.S. Gero
{"title":"Preliminary studies of a cabled water tower","authors":"E.M. To ,&nbsp;J.S. Gero","doi":"10.1016/0007-3628(75)90037-7","DOIUrl":null,"url":null,"abstract":"<div><p>This paper presents the concept of the cabled water tower and describes the preliminary investigation, design, construction, instrumentation and testing of a 1:12 scale model of a prototype of a 100,000 gal (453 m<sup>3</sup>) capacity. The prototype consists of a central steel core of 2.38 ft (703 mm) dia and an external system of cables in form of a hyperboloid of revolution supported vertically between two fixed rings. A water proofing membrane is placed inside the cable system distributing the water load onto the cables. Test results established the feasibility of the new concept and the method of analysis and design of cabled water towers developed here was validated.</p></div>","PeriodicalId":9442,"journal":{"name":"Building Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1975-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0007-3628(75)90037-7","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Building Science","FirstCategoryId":"1087","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0007362875900377","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents the concept of the cabled water tower and describes the preliminary investigation, design, construction, instrumentation and testing of a 1:12 scale model of a prototype of a 100,000 gal (453 m3) capacity. The prototype consists of a central steel core of 2.38 ft (703 mm) dia and an external system of cables in form of a hyperboloid of revolution supported vertically between two fixed rings. A water proofing membrane is placed inside the cable system distributing the water load onto the cables. Test results established the feasibility of the new concept and the method of analysis and design of cabled water towers developed here was validated.

电缆水塔的初步研究
本文介绍了电缆水塔的概念,并描述了一个容量为100,000加仑(453立方米)的1:12比例模型的初步调查、设计、建造、仪器仪表和测试。原型由一个直径为2.38英尺(703毫米)的中央钢芯和一个垂直支撑在两个固定环之间的双曲面形式的外部电缆系统组成。电缆系统内部放置防水膜,将水负荷分散到电缆上。试验结果证实了新概念的可行性,并验证了本文提出的电缆水塔分析设计方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信