{"title":"PERHITUNGAN PRODUKSI OVERBURDEN DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN NILAI OEE DARI EXCAVATOR KOBELCO SK-200","authors":"Vitri Rospitasari, D. Purwandari, A. Nugraha","doi":"10.46306/lb.v4i1.254","DOIUrl":null,"url":null,"abstract":"PT. Starindo Sakti Award is the place to carry out this research which is located in Pangandaran. This study uses the Overall Equipment Effectiveness (OEE) method to optimize mining equipment in achieving production targets for overburden stripping. Overall Equipment Effectiveness (OEE) is a method that has been accepted globally to measure the level of a company and the potential for improvement of the production process. Overall Equipment Effectiveness (OEE) aims to evaluate the performance of an equipment used in industry. The factors to be calculated on the OEE component are: Availability Factor, Utilization Factor, Speed ​​Factor, Bucket Factor, Overall Equipment Effectiveness (OEE) of Equipment. The results of the calculation of overburden production using the OEE method after improving working time by reducing standby time and increasing operating hours, the overburden production obtained from the Kobelco SK-200 excavator is 20,160.22 BCM. While the Overall Equipment Effectiveness (OEE) value of the Kobelco SK-200 excavator after repairs is 60%.","PeriodicalId":31699,"journal":{"name":"JMPM Jurnal Matematika dan Pendidikan Matematika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JMPM Jurnal Matematika dan Pendidikan Matematika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46306/lb.v4i1.254","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT. Starindo Sakti Award is the place to carry out this research which is located in Pangandaran. This study uses the Overall Equipment Effectiveness (OEE) method to optimize mining equipment in achieving production targets for overburden stripping. Overall Equipment Effectiveness (OEE) is a method that has been accepted globally to measure the level of a company and the potential for improvement of the production process. Overall Equipment Effectiveness (OEE) aims to evaluate the performance of an equipment used in industry. The factors to be calculated on the OEE component are: Availability Factor, Utilization Factor, Speed ​​Factor, Bucket Factor, Overall Equipment Effectiveness (OEE) of Equipment. The results of the calculation of overburden production using the OEE method after improving working time by reducing standby time and increasing operating hours, the overburden production obtained from the Kobelco SK-200 excavator is 20,160.22 BCM. While the Overall Equipment Effectiveness (OEE) value of the Kobelco SK-200 excavator after repairs is 60%.
PT. Starindo Sakti奖是开展这项研究的地方,位于邦干达兰。采用整体设备效率(OEE)方法对开采设备进行优化,实现覆岩剥脱生产目标。整体设备效率(OEE)是一种全球公认的衡量公司水平和生产过程改进潜力的方法。整体设备效率(OEE)旨在评估工业中使用的设备的性能。OEE组件上要计算的因素有:可用性因素、利用率因素、速度因素、铲斗因素、设备的整体设备效率(OEE)。通过减少待机时间、增加作业时间等措施提高作业时间后,采用OEE法计算覆盖层产量的结果表明,神钢SK-200挖掘机的覆盖层产量为20,160.22 BCM。而神钢SK-200挖掘机在维修后的整体设备效率(OEE)为60%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信