IMPLEMENTASI KEBIJAKAN PEMBANGUNAN INFASTRUKTUR MELALUI PROGRAM SAMISADE TERHADAP KEPUASAN MASYARAKAT DI KECAMATAN CIAWI

Anisa Cikal Febrianti, Abubakar Iskandar, Rusliandy Rusliandy
{"title":"IMPLEMENTASI KEBIJAKAN PEMBANGUNAN INFASTRUKTUR MELALUI PROGRAM SAMISADE TERHADAP KEPUASAN MASYARAKAT DI KECAMATAN CIAWI","authors":"Anisa Cikal Febrianti, Abubakar Iskandar, Rusliandy Rusliandy","doi":"10.37606/publik.v10i2.685","DOIUrl":null,"url":null,"abstract":"The purpose of research to analyze the implementation from policies through the SAMISADE program and to find out the response of community satisfaction towards infrastructure development in Ciawi District. This is qualitative research with a mixed method type between qualitative and quantitative with Merille S. Grindle's theoretical analysis. The study results show that the 2021 SAMISADE program has completed infrastructure development by village proposals. Infrastructure Development in Ciawi District, as many as 13 villages have completed infrastructure development in 20 construction locations. The condition of the dominant land contour in the Ciawi Subdistrict is in the form of cliffs, so more SAMISADE development funds were absorbed for constructing a Land Retaining Wall (TPT); this function is to stabilize soil conditions. However, there are several obstacles, including from the supervision side of SAMISADE in 2021; there needs to be more supervision in the ongoing development process. Furthermore, the program regulations that will run in 2021 it is considered that the public needs to understand the same as the existing regulations. From the point of view of community satisfaction with this program, it is calculated based on measurement (IKM) with a score obtained with an index number of 91.23, which means service quality A (Very Good). The element of the highest average value (NRR) is the element of Product Specification Type of Service (3.737). The lowest NRR is handling complaints, suggestions, and feedback (3.535). Community ratings are generally good, motivated by the fulfillment of community needs for infrastructure development in the villages of the Ciawi District.","PeriodicalId":34643,"journal":{"name":"JENIUS Jurnal Ilmiah Manajemen Sumber Daya Manusia","volume":"39 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JENIUS Jurnal Ilmiah Manajemen Sumber Daya Manusia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37606/publik.v10i2.685","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of research to analyze the implementation from policies through the SAMISADE program and to find out the response of community satisfaction towards infrastructure development in Ciawi District. This is qualitative research with a mixed method type between qualitative and quantitative with Merille S. Grindle's theoretical analysis. The study results show that the 2021 SAMISADE program has completed infrastructure development by village proposals. Infrastructure Development in Ciawi District, as many as 13 villages have completed infrastructure development in 20 construction locations. The condition of the dominant land contour in the Ciawi Subdistrict is in the form of cliffs, so more SAMISADE development funds were absorbed for constructing a Land Retaining Wall (TPT); this function is to stabilize soil conditions. However, there are several obstacles, including from the supervision side of SAMISADE in 2021; there needs to be more supervision in the ongoing development process. Furthermore, the program regulations that will run in 2021 it is considered that the public needs to understand the same as the existing regulations. From the point of view of community satisfaction with this program, it is calculated based on measurement (IKM) with a score obtained with an index number of 91.23, which means service quality A (Very Good). The element of the highest average value (NRR) is the element of Product Specification Type of Service (3.737). The lowest NRR is handling complaints, suggestions, and feedback (3.535). Community ratings are generally good, motivated by the fulfillment of community needs for infrastructure development in the villages of the Ciawi District.
通过SAMISADE计划,实现非结构化发展政策,以满足西维街道的社区满意度
本研究的目的是从政策上分析透过SAMISADE计划的执行情况,并找出社区对西亚维区基础设施发展的满意度反应。这是一种定性与定量相结合的定性研究,采用了Merille S. Grindle的理论分析方法。研究结果表明,2021年SAMISADE项目已经完成了村庄建议的基础设施发展。在西亚维区,多达13个村庄在20个施工地点完成了基础设施建设。Ciawi街道的优势土地轮廓条件为悬崖形式,因此吸收了更多SAMISADE开发资金用于建设土地挡土墙(TPT);这个功能是稳定土壤条件。然而,仍存在一些障碍,包括2021年SAMISADE的监管方面;在正在进行的开发过程中需要更多的监督。另外,预计2021年开始实施的项目规定也需要国民理解。从社区对该计划的满意度来看,它是基于测量(IKM)来计算的,得分为91.23,这意味着服务质量a(非常好)。最高平均值(NRR)的元素是产品规格服务类型(3.737)的元素。NRR最低的是处理投诉、建议和反馈(3.535)。由于满足了西亚维地区村庄基础设施发展的社区需求,社区评级总体良好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
20
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信