{"title":"Contractor’s Perspective on Key Performance Indicators of Cost Control in Asian, Middle Eastern, and European Construction Projects","authors":"B. Perera, C. Perera, C. Jayalath","doi":"10.1080/15578771.2020.1842567","DOIUrl":null,"url":null,"abstract":"ABSTRACT Construction project costs frequently deviate from their estimated costs. Cost controlling techniques/tools (CCTTs) can be used to monitor these deviations. However, the effectiveness of these techniques and tools has to be evaluated. Thus, the aim of this study was to identify the Key Performance Indicators (KPIs) of CCTTs used in Asian, Middle Eastern, and European construction projects. The study included a series of interviews with 15 experts to categorize the techniques and tools and identify their KPIs. A questionnaire survey was conducted among 300 chartered quantity surveyors to evaluate the level of significance of each CCTT and its KPIs. The highest number of CCTTs is implemented in the execution stage, while only few CCTTs are implemented in the initiation stage. The most significant technique used in the initiation stage is the ‘preliminary project estimate,’ and its most significant KPI is the ‘cost per functional unit.’ ‘Contract management’ is the most important technique used in the execution stage. ‘Final accounts’ with ‘effective contract sum’ as the KPI is the principle technique used in the closing stage.","PeriodicalId":39782,"journal":{"name":"International Journal of Construction Education and Research","volume":"9 1","pages":"217 - 233"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Education and Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/15578771.2020.1842567","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 4
Abstract
ABSTRACT Construction project costs frequently deviate from their estimated costs. Cost controlling techniques/tools (CCTTs) can be used to monitor these deviations. However, the effectiveness of these techniques and tools has to be evaluated. Thus, the aim of this study was to identify the Key Performance Indicators (KPIs) of CCTTs used in Asian, Middle Eastern, and European construction projects. The study included a series of interviews with 15 experts to categorize the techniques and tools and identify their KPIs. A questionnaire survey was conducted among 300 chartered quantity surveyors to evaluate the level of significance of each CCTT and its KPIs. The highest number of CCTTs is implemented in the execution stage, while only few CCTTs are implemented in the initiation stage. The most significant technique used in the initiation stage is the ‘preliminary project estimate,’ and its most significant KPI is the ‘cost per functional unit.’ ‘Contract management’ is the most important technique used in the execution stage. ‘Final accounts’ with ‘effective contract sum’ as the KPI is the principle technique used in the closing stage.
期刊介绍:
The International Journal of Construction Education and Research is a respected international refereed journal that publishes original works that address cutting edge issues related to construction around the globe. The Journal supports the mission of the Associated Schools of Construction (ASC), a professional association comprised of about 100 universities and colleges. The ASC encourages the sharing of ideas and knowledge and promotes excellence in curricula, teaching, research and service relating to the construction industry.