Court Efficiency and Procurement Performance

Decio Coviello, L. Moretti, G. Spagnolo, P. Valbonesi
{"title":"Court Efficiency and Procurement Performance","authors":"Decio Coviello, L. Moretti, G. Spagnolo, P. Valbonesi","doi":"10.1111/sjoe.12225","DOIUrl":null,"url":null,"abstract":"Disputes over penalties for breaching a contract are often resolved in court. A simple model illustrates how inefficient courts can sway public buyers from enforcing a penalty for late delivery in order to avoid litigation, therefore inducing sellers to delay contract delivery. By using a large dataset on Italian public procurement, we empirically study the effects of court inefficiency on public work performance. We find that where courts are inefficient: i) public works are delivered with longer delays; ii) delays increase for more valuable contracts; iii) contracts are more often awarded to larger suppliers; and iv) a higher share of the payment is postponed after delivery. Other interpretations receive less support from the data.","PeriodicalId":18164,"journal":{"name":"Macroeconomics: National Income & Product Accounts eJournal","volume":"72 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2014-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"72","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Macroeconomics: National Income & Product Accounts eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1111/sjoe.12225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 72

Abstract

Disputes over penalties for breaching a contract are often resolved in court. A simple model illustrates how inefficient courts can sway public buyers from enforcing a penalty for late delivery in order to avoid litigation, therefore inducing sellers to delay contract delivery. By using a large dataset on Italian public procurement, we empirically study the effects of court inefficiency on public work performance. We find that where courts are inefficient: i) public works are delivered with longer delays; ii) delays increase for more valuable contracts; iii) contracts are more often awarded to larger suppliers; and iv) a higher share of the payment is postponed after delivery. Other interpretations receive less support from the data.
法庭效率及采购表现
关于违约金的纠纷通常在法庭上解决。一个简单的模型说明了效率低下的法院是如何影响公共购买者为避免诉讼而执行延迟交付的处罚,从而诱导卖方延迟合同交付。本文利用意大利公共采购的大型数据集,实证研究了法院效率低下对公共工作绩效的影响。我们发现法院效率低下的地方:i)公共工程交付延误时间更长;Ii)更有价值的合同的延误增加;Iii)合同更多地被授予较大的供应商;iv)更高比例的付款延迟到交货后。其他解释从数据中得到的支持较少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信