Holistic analysis of the effect on electricity cost in South Africa’s platinum mines when varying shift schedules according to time-of-use tariffs

IF 0.6 4区 工程技术 Q4 ENERGY & FUELS
W. Shaw, M. Mathews, J. Marais
{"title":"Holistic analysis of the effect on electricity cost in South Africa’s platinum mines when varying shift schedules according to time-of-use tariffs","authors":"W. Shaw, M. Mathews, J. Marais","doi":"10.17159/2413-3051/2019/v30i4a5675","DOIUrl":null,"url":null,"abstract":"In the past the cost of electricity was not a significant concern and was not common practice for mining companies to consider peak time-of-use (TOU) tariffs for their shift schedules. It has become more prevalent, as TOU tariffs continue increasing, to consider energy saving important. A study was carried out to analyse the mining operation of a South African deep-level platinum mine in respect of integrated load management, shift changes and TOU schedules. This was achieved by thoroughly analysing energy consumers, mine operational schedules and their interconnectedness. A specific mining system was analysed as a case study and a maximum savings scenario was determined, using the methodology formulated. The maximum savings scenario schedule change resulted in a 1.3% cost reduction. System improvements had an additional potential reduction effect of 8.4%, which was primarily the result of a reduction in compressors’ power consumption. The implications of the proposed schedule adjustments necessitated a realistic scenario. The realistic scenario had an effective financial reduction of 0.7%. The realistic schedule change, however, opened the door for large system operational improvements, which could increase the reduction potential by 7.6%. The study methods described illustrate the potential implications of integrated load management and operational schedule optimisation on the power demand and cost savings in the mining industry, specifically focusing on deep-level platinum mines.","PeriodicalId":15666,"journal":{"name":"Journal of Energy in Southern Africa","volume":"3 1","pages":"26-40"},"PeriodicalIF":0.6000,"publicationDate":"2019-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Energy in Southern Africa","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.17159/2413-3051/2019/v30i4a5675","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 3

Abstract

In the past the cost of electricity was not a significant concern and was not common practice for mining companies to consider peak time-of-use (TOU) tariffs for their shift schedules. It has become more prevalent, as TOU tariffs continue increasing, to consider energy saving important. A study was carried out to analyse the mining operation of a South African deep-level platinum mine in respect of integrated load management, shift changes and TOU schedules. This was achieved by thoroughly analysing energy consumers, mine operational schedules and their interconnectedness. A specific mining system was analysed as a case study and a maximum savings scenario was determined, using the methodology formulated. The maximum savings scenario schedule change resulted in a 1.3% cost reduction. System improvements had an additional potential reduction effect of 8.4%, which was primarily the result of a reduction in compressors’ power consumption. The implications of the proposed schedule adjustments necessitated a realistic scenario. The realistic scenario had an effective financial reduction of 0.7%. The realistic schedule change, however, opened the door for large system operational improvements, which could increase the reduction potential by 7.6%. The study methods described illustrate the potential implications of integrated load management and operational schedule optimisation on the power demand and cost savings in the mining industry, specifically focusing on deep-level platinum mines.
根据分时电价变化轮班时间表对南非铂矿电力成本影响的整体分析
在过去,电力成本并不是一个重大问题,采矿公司考虑在其班次安排中征收高峰使用时间(TOU)关税也不是通常的做法。随着分时电价的不断提高,认为节约能源的重要性变得越来越普遍。进行了一项研究,分析南非一个深层铂矿在综合负荷管理、轮班变化和分时电价时间表方面的采矿作业。这是通过彻底分析能源消费者、矿山作业时间表及其相互联系来实现的。作为个案研究分析了一个具体的采矿系统,并利用所制订的方法确定了最大节省方案。最大节省方案的时间表更改导致成本降低1.3%。系统改进有8.4%的额外潜在降低效果,这主要是由于压缩机功耗的降低。拟议的时间表调整所涉问题需要一个现实的设想。现实情况下,财政支出的有效削减为0.7%。然而,现实的时间表变化为大规模的系统操作改进打开了大门,这可能会增加7.6%的减少潜力。所描述的研究方法说明了综合负荷管理和运行计划优化对采矿业电力需求和成本节约的潜在影响,特别是对深层铂矿的研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.00
自引率
0.00%
发文量
16
审稿时长
6 months
期刊介绍: The journal has a regional focus on southern Africa. Manuscripts that are accepted for consideration to publish in the journal must address energy issues in southern Africa or have a clear component relevant to southern Africa, including research that was set-up or designed in the region. The southern African region is considered to be constituted by the following fifteen (15) countries: Angola, Botswana, Democratic Republic of Congo, Lesotho, Malawi, Madagascar, Mauritius, Mozambique, Namibia, Seychelles, South Africa, Swaziland, Tanzania, Zambia and Zimbabwe. Within this broad field of energy research, topics of particular interest include energy efficiency, modelling, renewable energy, poverty, sustainable development, climate change mitigation, energy security, energy policy, energy governance, markets, technology and innovation.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信