{"title":"MECHANISMS OF OPERATIONAL PORTFOLIO MANAGEMENT OF PROJECTS IN SHIPBUILDING AND SHIP REPAIR","authors":"N. Fateev, I. Zaporozhets","doi":"10.30525/2500-946x/2021-1-9","DOIUrl":null,"url":null,"abstract":"Over the past decades, the competitiveness of enterprises in the world shipbuilding and ship repair markets is being determined by the level of development of information and communication technologies, on the basis of which global value chains are being formed. The shipbuilding 4.0 methodology is being introduced in the industry, which is based on the advanced technologies of the fourth industrial revolution. The aim of the article is to study the models and mechanisms for portfolio management of shipbuilding and ship repair enterprises on the basis of modern information technology for the effective implementation of strategic goals and sustainable development. The basis of the organizational and methodological support of portfolio management of shipbuilding enterprises is a system of planning and accounting units. This is a three-level model for the shipbuilding work breakdown. The first level of work breakdown consists of shop stages (list of works performed by a certain production department). The second level of work breakdown is technological sets that are being formed in the process of production planning on the principles of structural and technological unity of work and are the basic elements in the intershop operational management. Technological operations are carried out at the third level of work breakdown (brigade sets). At the upper levels of shipbuilding work breakdown, all the key features of project management take place. Technological sets are recommended to be used as an information and analytical basis when developing the network models at the upper levels of structural work breakdown. The methodology for portfolio management of projects of a shipbuilding enterprise described in the article is aimed at aligning the goals and objectives of individual projects and the portfolio as a whole with the strategic plans of the enterprise.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2021-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.30525/2500-946x/2021-1-9","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
Over the past decades, the competitiveness of enterprises in the world shipbuilding and ship repair markets is being determined by the level of development of information and communication technologies, on the basis of which global value chains are being formed. The shipbuilding 4.0 methodology is being introduced in the industry, which is based on the advanced technologies of the fourth industrial revolution. The aim of the article is to study the models and mechanisms for portfolio management of shipbuilding and ship repair enterprises on the basis of modern information technology for the effective implementation of strategic goals and sustainable development. The basis of the organizational and methodological support of portfolio management of shipbuilding enterprises is a system of planning and accounting units. This is a three-level model for the shipbuilding work breakdown. The first level of work breakdown consists of shop stages (list of works performed by a certain production department). The second level of work breakdown is technological sets that are being formed in the process of production planning on the principles of structural and technological unity of work and are the basic elements in the intershop operational management. Technological operations are carried out at the third level of work breakdown (brigade sets). At the upper levels of shipbuilding work breakdown, all the key features of project management take place. Technological sets are recommended to be used as an information and analytical basis when developing the network models at the upper levels of structural work breakdown. The methodology for portfolio management of projects of a shipbuilding enterprise described in the article is aimed at aligning the goals and objectives of individual projects and the portfolio as a whole with the strategic plans of the enterprise.
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.