Multi-mode resource constrained project scheduling problem along with contractor selection

IF 1.1 4区 计算机科学 Q4 COMPUTER SCIENCE, INFORMATION SYSTEMS
Reza Nemati-Lafmejani, Hamed Davari-Ardakani
{"title":"Multi-mode resource constrained project scheduling problem along with contractor selection","authors":"Reza Nemati-Lafmejani, Hamed Davari-Ardakani","doi":"10.1080/03155986.2020.1803720","DOIUrl":null,"url":null,"abstract":"Abstract In real-world environments, selecting the right contractor is an important issue which considerably influences completion time, total cost and quality of performing the project. This paper deals with the multi-mode resource constrained project scheduling problem (MRCPSP) and contractor selection (CS) in an integrated manner. In fact, each activity is assigned to a contractor, an execution mode is selected for each activity, and the start/finish times of activities are determined. This paper presents a bi-objective optimization model to deal with MRCPSP-CS, aiming to minimize the total cost and completion time of the project, simultaneously. Then, four multi-objective decision making (MODM) techniques are used to solve the proposed model. Since none of MODM techniques dominates other ones, Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used to assess the performance of MODM techniques, confirming that MCGP-U outranks other ones. Finally, the augmented -Constraint method is used to solve some test problems, and perform sensitivity analysis on the number of contractors. Sensitivity analyses show that by increasing the number of available contractors, the Pareto front is significantly improved, and the Number of Pareto-optimal Solutions (NPS) increases. This helps decision maker(s) make appropriate decisions in a more flexible manner.","PeriodicalId":13645,"journal":{"name":"Infor","volume":"150 1","pages":"212 - 231"},"PeriodicalIF":1.1000,"publicationDate":"2020-08-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infor","FirstCategoryId":"94","ListUrlMain":"https://doi.org/10.1080/03155986.2020.1803720","RegionNum":4,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"COMPUTER SCIENCE, INFORMATION SYSTEMS","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract In real-world environments, selecting the right contractor is an important issue which considerably influences completion time, total cost and quality of performing the project. This paper deals with the multi-mode resource constrained project scheduling problem (MRCPSP) and contractor selection (CS) in an integrated manner. In fact, each activity is assigned to a contractor, an execution mode is selected for each activity, and the start/finish times of activities are determined. This paper presents a bi-objective optimization model to deal with MRCPSP-CS, aiming to minimize the total cost and completion time of the project, simultaneously. Then, four multi-objective decision making (MODM) techniques are used to solve the proposed model. Since none of MODM techniques dominates other ones, Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used to assess the performance of MODM techniques, confirming that MCGP-U outranks other ones. Finally, the augmented -Constraint method is used to solve some test problems, and perform sensitivity analysis on the number of contractors. Sensitivity analyses show that by increasing the number of available contractors, the Pareto front is significantly improved, and the Number of Pareto-optimal Solutions (NPS) increases. This helps decision maker(s) make appropriate decisions in a more flexible manner.
多模式资源约束下的项目调度问题及承包商选择
在现实环境中,选择合适的承包商是一个重要的问题,它对工程的完工时间、总成本和执行质量有很大的影响。本文将多模式资源约束下的项目调度问题(MRCPSP)与承包商选择问题(CS)进行了综合研究。实际上,将每个活动分配给一个承包商,为每个活动选择执行模式,并确定活动的开始/结束时间。本文提出了一个处理MRCPSP-CS的双目标优化模型,旨在同时使项目的总成本和完工时间最小化。然后,采用四种多目标决策(MODM)技术对模型进行求解。由于没有一种MODM技术优于其他技术,因此使用TOPSIS (technical for Order of Preference by Similarity to Ideal Solution)来评估MODM技术的性能,证实MCGP-U优于其他技术。最后,利用增广约束方法解决了一些测试问题,并对承包商数量进行了敏感性分析。敏感性分析表明,随着承包者数量的增加,Pareto前沿得到显著改善,Pareto最优解(NPS)数量增加。这有助于决策者以更灵活的方式做出适当的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Infor
Infor 管理科学-计算机:信息系统
CiteScore
2.60
自引率
7.70%
发文量
16
审稿时长
>12 weeks
期刊介绍: INFOR: Information Systems and Operational Research is published and sponsored by the Canadian Operational Research Society. It provides its readers with papers on a powerful combination of subjects: Information Systems and Operational Research. The importance of combining IS and OR in one journal is that both aim to expand quantitative scientific approaches to management. With this integration, the theory, methodology, and practice of OR and IS are thoroughly examined. INFOR is available in print and online.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信