{"title":"SELECTION OF STANDARD CONSTRUCTION CONTRACTS MODEL AND CONTRACT PURCHASE PRICING","authors":"Arvydas Vilkonis","doi":"10.3846/mla.2022.16054","DOIUrl":null,"url":null,"abstract":"The aim of the research is to determine for a contract’s “Design and construction works of Vilnius city wastewater treatment plant” the most suitable variant of the combination of the FIDIC standard construction contract model and the purchase pricing of contract works using the SAW. Based on expert assessments, a matrix of possible solutions is formed by interviewing 8 experts (4 public procurement specialists and 4 civil engineers). Calculations have shown that the most appropriate combination of the FIDIC standard construction contract model and contract purchase pricing is the FIDIC Yellow Book and fixed price pricing. The obtained research results mainly reflect the essence of the FIDIC Yellow Book, assessing the specifics of the contract and the complexity of the planned works.","PeriodicalId":30324,"journal":{"name":"Mokslas Lietuvos Ateitis","volume":"55 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mokslas Lietuvos Ateitis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3846/mla.2022.16054","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The aim of the research is to determine for a contract’s “Design and construction works of Vilnius city wastewater treatment plant” the most suitable variant of the combination of the FIDIC standard construction contract model and the purchase pricing of contract works using the SAW. Based on expert assessments, a matrix of possible solutions is formed by interviewing 8 experts (4 public procurement specialists and 4 civil engineers). Calculations have shown that the most appropriate combination of the FIDIC standard construction contract model and contract purchase pricing is the FIDIC Yellow Book and fixed price pricing. The obtained research results mainly reflect the essence of the FIDIC Yellow Book, assessing the specifics of the contract and the complexity of the planned works.