on reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model

Systems Engineering Procedia Pub Date : 2012-01-01 Epub Date: 2012-01-19 DOI:10.1016/j.sepro.2011.11.087
Fang Li , Gao Xianyi , Ma Xin
{"title":"on reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model","authors":"Fang Li ,&nbsp;Gao Xianyi ,&nbsp;Ma Xin","doi":"10.1016/j.sepro.2011.11.087","DOIUrl":null,"url":null,"abstract":"<div><p>In view of the previous studies on uncontrollable construction cost, which mostly were based on the practical experiences and subjective speculating, the conclusions were empirical and lack of data support. In order to solve this problem, the quantitative analysis methods are introduced here. The application of ABC analysis method can distinguish the minor-key factors from tremendous factors which influence the cost changes. And the complete decomposition of construction cost changes can decompose the main effects of the cost changes to define the key effects. Through applying these two methods, the construction cost can be controlled by mainly controlling the key factors and effects of the projects. Besides, project data of uncontrollable construction cost can be accumulated to provide objective and scientific suggestions on controlling cost. A completed small civil engineering is presented as an example.</p></div>","PeriodicalId":101207,"journal":{"name":"Systems Engineering Procedia","volume":"4 ","pages":"Pages 359-365"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.sepro.2011.11.087","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2211381911002402","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"2012/1/19 0:00:00","PubModel":"Epub","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In view of the previous studies on uncontrollable construction cost, which mostly were based on the practical experiences and subjective speculating, the conclusions were empirical and lack of data support. In order to solve this problem, the quantitative analysis methods are introduced here. The application of ABC analysis method can distinguish the minor-key factors from tremendous factors which influence the cost changes. And the complete decomposition of construction cost changes can decompose the main effects of the cost changes to define the key effects. Through applying these two methods, the construction cost can be controlled by mainly controlling the key factors and effects of the projects. Besides, project data of uncontrollable construction cost can be accumulated to provide objective and scientific suggestions on controlling cost. A completed small civil engineering is presented as an example.

基于ABC分析法和完全分解模型研究了工程造价不可控的原因
鉴于以往对不可控工程造价的研究多基于实践经验和主观臆测,结论是经验性的,缺乏数据支持。为了解决这一问题,本文介绍了定量分析方法。运用ABC分析法可以区分影响成本变化的次要因素和重大因素。对工程造价变化进行全面分解,可以分解出造价变化的主要影响因素,从而确定关键影响因素。通过这两种方法的应用,可以通过主要控制工程的关键因素和影响来控制工程造价。同时,积累工程造价不可控的项目数据,为工程造价控制提供客观、科学的建议。以一个已完成的小型土木工程为例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书