{"title":"Optimization of Critical Chain Multi-project Schedule Based on Delay Loss","authors":"Luofan Li, W. Zhan","doi":"10.1145/3588243.3588277","DOIUrl":null,"url":null,"abstract":"In order to solve the problems of schedule conflict, resource competition and cost overruns, a new management model of critical chain multi-project schedule based on delay loss of activity is proposed. First, a priority rule based on minimum activity delay loss and the calculation formula is provided. Then, with the goal of the shortest project duration and the lowest cost, a schedule management model of critical chain multi-project is constructed, and genetic algorithm is designed to identify the critical chain of the multi-project. Finally, a case study is provided to verify the shortest duration, lowest cost and maximum resource utilization of the multi-project schedule using this method.","PeriodicalId":37324,"journal":{"name":"International Journal on E-Learning: Corporate, Government, Healthcare, and Higher Education","volume":"27 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal on E-Learning: Corporate, Government, Healthcare, and Higher Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3588243.3588277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0
Abstract
In order to solve the problems of schedule conflict, resource competition and cost overruns, a new management model of critical chain multi-project schedule based on delay loss of activity is proposed. First, a priority rule based on minimum activity delay loss and the calculation formula is provided. Then, with the goal of the shortest project duration and the lowest cost, a schedule management model of critical chain multi-project is constructed, and genetic algorithm is designed to identify the critical chain of the multi-project. Finally, a case study is provided to verify the shortest duration, lowest cost and maximum resource utilization of the multi-project schedule using this method.