Analysis on Factors Causing Project Delays in Road and Highways Sector in India Using Relative Ranking Index Technique

Q1 Social Sciences
Siddesh K. Pai, N. Anand, Ankut Mittal
{"title":"Analysis on Factors Causing Project Delays in Road and Highways Sector in India Using Relative Ranking Index Technique","authors":"Siddesh K. Pai, N. Anand, Ankut Mittal","doi":"10.30564/jcr.v3i2.4157","DOIUrl":null,"url":null,"abstract":"On-time completion of road infrastructure projects is a critical goal. Whenprojects were not completed on schedule and real construction progress isslower than expected, the inconvenience and disruption to business accessincreases. On time completion is linked to economic and social welfare,as well as safety. Construction delays continue to be a typical occurrence,despite the need of prompt completion.A literature study is conducted in this context in order to learn more aboutthe causes and factors that contribute to delays. Following a thoroughreview of the literature, it was determined that a questionnaire survey isthe most effective and trustworthy way for gathering information about thecauses and quantifying delays caused by emergent factors. The RelativeImportance Index (RII) method was used to analyze the data, and thereasons for the delay were prioritized according to their importance. Thisstudy focuses on the emergent concerns/causes and reasons of concernin road infrastructure projects, as well as how to priorities these issuessequentially during the planning stage. This study survey can assistconstruction companies doing business in India in understanding theessential or sensitive issues that require special attention in order to conducttheir businesses smoothly in this country while employing appropriateproject management practices.","PeriodicalId":39782,"journal":{"name":"International Journal of Construction Education and Research","volume":"28 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Education and Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30564/jcr.v3i2.4157","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

On-time completion of road infrastructure projects is a critical goal. Whenprojects were not completed on schedule and real construction progress isslower than expected, the inconvenience and disruption to business accessincreases. On time completion is linked to economic and social welfare,as well as safety. Construction delays continue to be a typical occurrence,despite the need of prompt completion.A literature study is conducted in this context in order to learn more aboutthe causes and factors that contribute to delays. Following a thoroughreview of the literature, it was determined that a questionnaire survey isthe most effective and trustworthy way for gathering information about thecauses and quantifying delays caused by emergent factors. The RelativeImportance Index (RII) method was used to analyze the data, and thereasons for the delay were prioritized according to their importance. Thisstudy focuses on the emergent concerns/causes and reasons of concernin road infrastructure projects, as well as how to priorities these issuessequentially during the planning stage. This study survey can assistconstruction companies doing business in India in understanding theessential or sensitive issues that require special attention in order to conducttheir businesses smoothly in this country while employing appropriateproject management practices.
用相对排名指数法分析印度公路工程项目延误的原因
按时完成道路基础设施项目是一个关键目标。当项目没有按时完成,实际施工进度低于预期时,业务访问的不便和中断就会增加。按时完工关系到经济和社会福利,也关系到安全。尽管需要及时完工,但施工延误仍然是一个典型的事件。在此背景下进行了一项文献研究,以便更多地了解导致延误的原因和因素。经过对文献的全面回顾,我们确定问卷调查是收集原因信息和量化由紧急因素引起的延误的最有效和最可靠的方法。采用相对重要性指数(RelativeImportance Index, RII)法对数据进行分析,并根据延迟原因的重要性对其进行排序。本研究的重点是道路基础设施项目的紧急问题/原因和关注的原因,以及如何在规划阶段优先考虑这些问题。本研究调查可以帮助在印度开展业务的建筑公司了解需要特别注意的基本或敏感问题,以便在这个国家顺利开展业务,同时采用适当的项目管理实践。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.80
自引率
0.00%
发文量
19
期刊介绍: The International Journal of Construction Education and Research is a respected international refereed journal that publishes original works that address cutting edge issues related to construction around the globe. The Journal supports the mission of the Associated Schools of Construction (ASC), a professional association comprised of about 100 universities and colleges. The ASC encourages the sharing of ideas and knowledge and promotes excellence in curricula, teaching, research and service relating to the construction industry.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信