Productivity Improvement and Reduction of Lead Time in Manufacturing Industry Using Lean Tools

S. Parthasarathi, M. K. Prabhu, J Krishanamani, L Mitun, G. Vellingiri, C. Rahul
{"title":"Productivity Improvement and Reduction of Lead Time in Manufacturing Industry Using Lean Tools","authors":"S. Parthasarathi, M. K. Prabhu, J Krishanamani, L Mitun, G. Vellingiri, C. Rahul","doi":"10.11648/J.IE.20210501.11","DOIUrl":null,"url":null,"abstract":"To look at the current arrangement of a creation line in a shop floor of controlling stuff box fabricating industry also, to improve the profitability utilizing lean strategy absent really any influencing current working frameworks. Technique/ Examination: Broad scopes of lean assembling devices are accessible to deal with a wide range of issues looked by changed fabricating businesses. It likewise helps for effective expense decrease of the assembling part and to guarantee the nature of maker and client. Discoveries: The basic Non-Value added Activities (NVA) were perceived and probabilities needed for improvement has been perceived. Value Stream Mapping (VSM) has the standing of finding squander during assembling and business measure which encourage distinguishing and eliminating or stream the worth added steps furthermore, to kill the non-esteem added steps. Application/Improvements: After achievement of fitting lean instruments, it was discovered that the all out arrangement time was consolidated by around 180 minutes and process duration was dense by about 98 minutes which eventually decreases the lead time and builds the efficiency. A lean manufacturing initiative focuses on cost reduction and increases in turnover by systematically and continuously eliminating non-value-added activities. In today's competitive market, lean is turning out to be \"the solution\" to manufacturing industries across the spectrum for survival and success.","PeriodicalId":13667,"journal":{"name":"Industrial & Engineering Chemistry","volume":"23 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Industrial & Engineering Chemistry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11648/J.IE.20210501.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To look at the current arrangement of a creation line in a shop floor of controlling stuff box fabricating industry also, to improve the profitability utilizing lean strategy absent really any influencing current working frameworks. Technique/ Examination: Broad scopes of lean assembling devices are accessible to deal with a wide range of issues looked by changed fabricating businesses. It likewise helps for effective expense decrease of the assembling part and to guarantee the nature of maker and client. Discoveries: The basic Non-Value added Activities (NVA) were perceived and probabilities needed for improvement has been perceived. Value Stream Mapping (VSM) has the standing of finding squander during assembling and business measure which encourage distinguishing and eliminating or stream the worth added steps furthermore, to kill the non-esteem added steps. Application/Improvements: After achievement of fitting lean instruments, it was discovered that the all out arrangement time was consolidated by around 180 minutes and process duration was dense by about 98 minutes which eventually decreases the lead time and builds the efficiency. A lean manufacturing initiative focuses on cost reduction and increases in turnover by systematically and continuously eliminating non-value-added activities. In today's competitive market, lean is turning out to be "the solution" to manufacturing industries across the spectrum for survival and success.
利用精益工具提高生产效率和缩短交货时间
看看控制物料箱制造行业的车间生产线的当前安排,利用精益战略提高盈利能力,没有任何影响当前工作框架。技术/检查:广泛的精益装配设备可用于处理变化的制造企业所关注的各种问题。这也有助于有效降低装配件的成本,保证制造商和客户的性质。发现:发现了基本的非增值活动(NVA),并发现了改进所需的可能性。价值流图(价值流图)具有发现装配过程中浪费的地位和鼓励区分、消除或流化增值步骤的业务措施,进而扼杀无价值增值步骤。应用/改进:在实现精益仪器的装配后,发现所有的安排时间缩短了180分钟左右,过程时间缩短了98分钟左右,最终缩短了交货时间,提高了效率。精益生产计划的重点是通过系统地、持续地消除非增值活动来降低成本和增加营业额。在当今竞争激烈的市场中,精益正成为制造业生存和成功的“解决方案”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信