Monte-Carlo simulation of information system project performance

Weihua Yang, Cong Tian
{"title":"Monte-Carlo simulation of information system project performance","authors":"Weihua Yang,&nbsp;Cong Tian","doi":"10.1016/j.sepro.2011.11.039","DOIUrl":null,"url":null,"abstract":"<div><p>This paper aims to put forward an approach to verify the feasible degree of information system development engineering project and indentify the key risk factors in the process of system development. Firstly, six risk factors, to which have been paid great attention in risk management area, are chosen as independent random variables. Then we use Crystal ball software to fit a probablity distribution for each risk factor, also the structural equation modeling method is adopted to establish a mathematical formula between risk factors and project performance. Finally, we run a Monte-Carlo simulation and get the frequency chart and sensitivity chart of performance, from that we can know about the statistic data and the key risk factors. The conclusion shows that the mean value of project performance is high and User Participation, Project Communication, Personnel Conflict have most greatest impact on project performance.</p></div>","PeriodicalId":101207,"journal":{"name":"Systems Engineering Procedia","volume":"3 ","pages":"Pages 340-345"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.sepro.2011.11.039","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2211381911001925","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

This paper aims to put forward an approach to verify the feasible degree of information system development engineering project and indentify the key risk factors in the process of system development. Firstly, six risk factors, to which have been paid great attention in risk management area, are chosen as independent random variables. Then we use Crystal ball software to fit a probablity distribution for each risk factor, also the structural equation modeling method is adopted to establish a mathematical formula between risk factors and project performance. Finally, we run a Monte-Carlo simulation and get the frequency chart and sensitivity chart of performance, from that we can know about the statistic data and the key risk factors. The conclusion shows that the mean value of project performance is high and User Participation, Project Communication, Personnel Conflict have most greatest impact on project performance.

蒙特卡罗模拟信息系统项目绩效
本文旨在提出一种验证信息系统开发工程项目可行性的方法,并识别系统开发过程中的关键风险因素。首先,选取风险管理领域中备受关注的6个风险因素作为独立随机变量;然后利用水晶球软件拟合各风险因素的概率分布,并采用结构方程建模方法建立风险因素与项目绩效之间的数学公式。最后进行蒙特卡罗模拟,得到了性能的频率图和灵敏度图,从中了解了统计数据和关键的危险因素。结果表明,项目绩效均值较高,用户参与、项目沟通、人员冲突对项目绩效的影响最大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信