{"title":"Design of a priority-based load shed scheme and operation tests","authors":"M. Adamiak, M. Schiefen, G. Schauerman, B. Cable","doi":"10.1109/PCIC.2010.5666862","DOIUrl":null,"url":null,"abstract":"Many large industrials operate internal co-generation systems to provide a substantial portion of their own power as well as to use the resulting output heat as part of their industrial process. Depending on the amount of co-generation, on loss of connection to the main grid or instability of the grid, these industrials may have the option of supplying all internal electrical loads from the co-generation or rather, shed a portion of the load in order to maintain plant stability. In order to maintain and maximize plant operations during either an islanded condition, a severe (and dropping) underfrequency condition, or a prolonged under voltage condition, a load shed scheme needs to dynamically monitor the load-generation unbalance in the plant and, upon detecting or determining any of the above conditions, needs to quickly initiate shedding of the optimal amount of load — based on a user-determined priority schedule. Examples of an actual load shed test are shown and analyzed.","PeriodicalId":67291,"journal":{"name":"中国石油和化工(企业版)","volume":"1 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"22","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"中国石油和化工(企业版)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/PCIC.2010.5666862","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22

Abstract

Many large industrials operate internal co-generation systems to provide a substantial portion of their own power as well as to use the resulting output heat as part of their industrial process. Depending on the amount of co-generation, on loss of connection to the main grid or instability of the grid, these industrials may have the option of supplying all internal electrical loads from the co-generation or rather, shed a portion of the load in order to maintain plant stability. In order to maintain and maximize plant operations during either an islanded condition, a severe (and dropping) underfrequency condition, or a prolonged under voltage condition, a load shed scheme needs to dynamically monitor the load-generation unbalance in the plant and, upon detecting or determining any of the above conditions, needs to quickly initiate shedding of the optimal amount of load — based on a user-determined priority schedule. Examples of an actual load shed test are shown and analyzed.
基于优先级的减载方案设计及运行试验
许多大型工业企业运行内部热电联产系统,以提供其自身电力的很大一部分,并使用由此产生的输出热量作为其工业过程的一部分。根据热电联产的数量,在与主电网的连接中断或电网不稳定的情况下,这些工业企业可以选择从热电联产提供所有内部电力负荷,或者更确切地说,为了保持工厂的稳定,减少一部分负荷。为了在孤岛状态、严重(且不断下降)的低频状态或长时间的低压状态下维持和最大限度地提高电厂的运行,减载方案需要动态监测电厂的负荷产生不平衡,并且在检测或确定上述任何一种情况后,需要根据用户确定的优先级计划快速启动最优负荷的减载。给出了实际减载试验的实例并进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
346
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书