{"title":"Accurate determination of losses in high current controlled transformer-rectifier systems for copper electrochemical plants","authors":"R. Fuentes, J. Estrada, G. Pacheco","doi":"10.1109/PCICON.2011.6085867","DOIUrl":null,"url":null,"abstract":"The DC load current in copper electrochemical plants is normally supplied by two or four similar transformer-rectifiers connected in parallel, 6 pulses each (12 or 24 pulse systems respectively). An accurate determination of losses in transformer-rectifiers is very important, because it establishes the true value of efficiency and hence, the cost of copper production. The efficiencies of the transformer - rectifiers declared by the manufacturers are not always checked in the plants, once the transformer-rectifiers are fully operating. A true measurement of losses must consider the actual waveform of AC voltages and AC currents, including harmonic effects. However, at the factory the tests are focused to measure losses at rated sinusoidal voltage and reduced current or losses at rated sinusoidal current and reduced voltage, but not both rated variables simultaneously. In this paper, a method to measure in the factory the losses at rated voltage and rated current is proposed.","PeriodicalId":67291,"journal":{"name":"中国石油和化工(企业版)","volume":"13 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"中国石油和化工(企业版)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/PCICON.2011.6085867","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The DC load current in copper electrochemical plants is normally supplied by two or four similar transformer-rectifiers connected in parallel, 6 pulses each (12 or 24 pulse systems respectively). An accurate determination of losses in transformer-rectifiers is very important, because it establishes the true value of efficiency and hence, the cost of copper production. The efficiencies of the transformer - rectifiers declared by the manufacturers are not always checked in the plants, once the transformer-rectifiers are fully operating. A true measurement of losses must consider the actual waveform of AC voltages and AC currents, including harmonic effects. However, at the factory the tests are focused to measure losses at rated sinusoidal voltage and reduced current or losses at rated sinusoidal current and reduced voltage, but not both rated variables simultaneously. In this paper, a method to measure in the factory the losses at rated voltage and rated current is proposed.
铜电化学装置大电流控制变压器-整流系统损耗的精确测定
铜电化学装置的直流负载电流通常由两个或四个相似的变压器-整流器并联供电,每个变压器-整流器并联6个脉冲(分别为12个或24个脉冲系统)。准确测定变压器-整流器的损耗是非常重要的,因为它确定了效率的真实价值,从而确定了铜生产的成本。一旦变压器-整流器全面运行,工厂并不总是检查制造商宣称的变压器-整流器的效率。真正的损耗测量必须考虑交流电压和交流电流的实际波形,包括谐波效应。但是,在工厂,测试的重点是测量额定正弦电压和减小电流下的损耗,或测量额定正弦电流和减小电压下的损耗,而不是同时测量两个额定变量。本文提出了一种在工厂中测量额定电压和额定电流下损耗的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
346
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书