Simulation analysis of crack cause of concrete overflow dam for Hadashan Hydro Project by 3-D FEM

Cao Fujun , Fang Guohua , Ma Xiaogang , Hu Zhinong
{"title":"Simulation analysis of crack cause of concrete overflow dam for Hadashan Hydro Project by 3-D FEM","authors":"Cao Fujun ,&nbsp;Fang Guohua ,&nbsp;Ma Xiaogang ,&nbsp;Hu Zhinong","doi":"10.1016/j.sepro.2011.11.007","DOIUrl":null,"url":null,"abstract":"<div><p>This paper is mainly to study the cracking reasons for concrete overflow dam of Hadashan Hydro Project. The three-dimensional finite element method (3-D FEM) is developed to simulation analysis the temperature and thermal stress distribution in the concrete overflow dam during the construction period. The results show that the crack of the concrete overflow dam is temperature crack, mainly due to the combined action of the internal thermal gradient and the external restraints; and dramatic changes in ambient temperature exacerbate cracking of early-age concrete. Finally, the results are applied to provide some references for the construction in the related fields.</p></div>","PeriodicalId":101207,"journal":{"name":"Systems Engineering Procedia","volume":"3 ","pages":"Pages 48-54"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.sepro.2011.11.007","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2211381911001603","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

This paper is mainly to study the cracking reasons for concrete overflow dam of Hadashan Hydro Project. The three-dimensional finite element method (3-D FEM) is developed to simulation analysis the temperature and thermal stress distribution in the concrete overflow dam during the construction period. The results show that the crack of the concrete overflow dam is temperature crack, mainly due to the combined action of the internal thermal gradient and the external restraints; and dramatic changes in ambient temperature exacerbate cracking of early-age concrete. Finally, the results are applied to provide some references for the construction in the related fields.

哈大山水电站混凝土溢流坝裂缝成因的三维有限元模拟分析
本文主要对哈大山水利枢纽工程混凝土溢流坝开裂原因进行了研究。采用三维有限元法对混凝土溢流坝施工期间的温度和热应力分布进行了模拟分析。结果表明:混凝土溢流坝裂缝为温度裂缝,主要是内部热梯度和外部约束共同作用的结果;环境温度的剧烈变化加剧了早期混凝土的开裂。最后,将研究结果应用于相关领域的建设提供一定的参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信