{"title":"Some issues of the critical ratio dispatch rule in semiconductor manufacturing","authors":"O. Rose","doi":"10.1109/WSC.2002.1166410","DOIUrl":null,"url":null,"abstract":"In this paper, we examine the cycle time and on-time delivery performance of a semiconductor wafer fabrication facility (wafer fab) under critical ratio (CR) dispatch regime. It turns out that determining appropriate due dates for this rule is a critical task. We provide a detailed analysis of the wafer fab behavior for a large range of due date values. From the results of the experiments we develop an heuristic for conservative due date estimates.","PeriodicalId":74535,"journal":{"name":"Proceedings of the ... Winter Simulation Conference. Winter Simulation Conference","volume":"53 1","pages":"1401-1405 vol.2"},"PeriodicalIF":0.0000,"publicationDate":"2002-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"48","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the ... Winter Simulation Conference. Winter Simulation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2002.1166410","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 48
Abstract
In this paper, we examine the cycle time and on-time delivery performance of a semiconductor wafer fabrication facility (wafer fab) under critical ratio (CR) dispatch regime. It turns out that determining appropriate due dates for this rule is a critical task. We provide a detailed analysis of the wafer fab behavior for a large range of due date values. From the results of the experiments we develop an heuristic for conservative due date estimates.