{"title":"Interfaces between MV and LV assemblies and power generation facilities in petrochemical plants - a Brazilian experience","authors":"Luiz Felipe O. Costa, R. C. Barros","doi":"10.1109/PCICON.2011.6085884","DOIUrl":null,"url":null,"abstract":"The Brazilian Petroleum and Chemical Industry has been facing an ever increasing use of dedicated generation facilities. The use of turbo-generators coupled to gas or steam turbines to partially or totally supply, the electric needs of petrochemical units, has resulted in problems, especially when interconnected with local utility companies.","PeriodicalId":67291,"journal":{"name":"中国石油和化工(企业版)","volume":"36 1","pages":"1-13"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"中国石油和化工(企业版)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.1109/PCICON.2011.6085884","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
The Brazilian Petroleum and Chemical Industry has been facing an ever increasing use of dedicated generation facilities. The use of turbo-generators coupled to gas or steam turbines to partially or totally supply, the electric needs of petrochemical units, has resulted in problems, especially when interconnected with local utility companies.