{"title":"Effect Evaluation of Construction Engineerization Management for Military Projects","authors":"Wang Shuqiang , Wang Qiankun","doi":"10.1016/j.sepro.2011.11.041","DOIUrl":null,"url":null,"abstract":"<div><p>In order to solve batch construction problems of military projects with specific attributes, this paper proposes the engineerization management method, discusses the connotation and main contents of engineerization management, and applies the DEA method in effect evaluation of engineerization management for the first time. The authors establish the DEA model of single aircraft shelter engineering, analyse the calculation results. The research has both theoretical value and operability of practice. It also has reference value to some civil project management that satisfies the conditions of engineerization.</p></div>","PeriodicalId":101207,"journal":{"name":"Systems Engineering Procedia","volume":"3 ","pages":"Pages 351-356"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.sepro.2011.11.041","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2211381911001949","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
In order to solve batch construction problems of military projects with specific attributes, this paper proposes the engineerization management method, discusses the connotation and main contents of engineerization management, and applies the DEA method in effect evaluation of engineerization management for the first time. The authors establish the DEA model of single aircraft shelter engineering, analyse the calculation results. The research has both theoretical value and operability of practice. It also has reference value to some civil project management that satisfies the conditions of engineerization.