on Reallocation of Failed Project Resource Based on Priority

Ye Jianmu, You Shenbao, Zhang Jing
{"title":"on Reallocation of Failed Project Resource Based on Priority","authors":"Ye Jianmu,&nbsp;You Shenbao,&nbsp;Zhang Jing","doi":"10.1016/j.sepro.2011.11.084","DOIUrl":null,"url":null,"abstract":"<div><p>Failed projects exist objectively and massively, and their real existence and potential values of their resources require for re-allocation. Nowadays more than 90% of the projects exist in the multi-project environment, and re-allocation of failed project resources is referred to the sort-order problem. Based on the theory of Earned Value, the article integrates three indexes: schedule, cost and quality through the introduction of Benefit/Penalty function and utilized function value to measure the implementation status of the project. According to the special nature of failed project resources, “relevance” factor needs to be put into consideration. In the end, case analysis shows the method can work out sort problems of re-allocation effectively.</p></div>","PeriodicalId":101207,"journal":{"name":"Systems Engineering Procedia","volume":"4 ","pages":"Pages 338-344"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.sepro.2011.11.084","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering Procedia","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2211381911002372","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Failed projects exist objectively and massively, and their real existence and potential values of their resources require for re-allocation. Nowadays more than 90% of the projects exist in the multi-project environment, and re-allocation of failed project resources is referred to the sort-order problem. Based on the theory of Earned Value, the article integrates three indexes: schedule, cost and quality through the introduction of Benefit/Penalty function and utilized function value to measure the implementation status of the project. According to the special nature of failed project resources, “relevance” factor needs to be put into consideration. In the end, case analysis shows the method can work out sort problems of re-allocation effectively.

基于优先级的失败项目资源再分配研究
失败项目是客观大量存在的,其资源的真实存在和潜在价值需要重新配置。目前90%以上的项目存在多项目环境,失败项目资源的重新分配涉及到排序问题。本文以挣值理论为基础,通过引入收益/惩罚函数,将进度、成本、质量三个指标整合在一起,利用功能值来衡量项目的实施状况。根据失败项目资源的特殊性,需要考虑“相关性”因素。最后,通过实例分析表明,该方法能有效地解决再分配排序问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信