{"title":"A METHOD FOR DETERMINING BRIDGE PAINTING CYCLES","authors":"C. Kirsch","doi":"10.3323/JCORR1954.15.2_72","DOIUrl":null,"url":null,"abstract":"FACTORS INFLUENCING EFFECTIVENESS, COST, AND TIME CYCLES FOR BRIDGE PAINTING ARE DISCUSSED. STRUCTURAL, ENVIRONMENTAL , AND CHEMICAL FACTORS OF THE PAINT SYSTEM ARE CONSIDERED IN THE MATHEMATICAL MODEL DESCRIBED. HOW MATHEMATICAL EVALUATION CAN AFFECT THE DECISION OF OPTIMUM PAINTING CYCLE TIMES IS SHOWN. THE PROCEDURE HAS BEEN USED BY PORT OF NEW YORK AUTHORITY, TUNNELS AND BRIDGES DEPARTMENT, TO EVALUATE PAINTING CYCLES FOR NEW YORK BRIDGES.","PeriodicalId":18284,"journal":{"name":"Materials protection","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"1965-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.3323/JCORR1954.15.2_72","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Materials protection","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.3323/JCORR1954.15.2_72","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
FACTORS INFLUENCING EFFECTIVENESS, COST, AND TIME CYCLES FOR BRIDGE PAINTING ARE DISCUSSED. STRUCTURAL, ENVIRONMENTAL , AND CHEMICAL FACTORS OF THE PAINT SYSTEM ARE CONSIDERED IN THE MATHEMATICAL MODEL DESCRIBED. HOW MATHEMATICAL EVALUATION CAN AFFECT THE DECISION OF OPTIMUM PAINTING CYCLE TIMES IS SHOWN. THE PROCEDURE HAS BEEN USED BY PORT OF NEW YORK AUTHORITY, TUNNELS AND BRIDGES DEPARTMENT, TO EVALUATE PAINTING CYCLES FOR NEW YORK BRIDGES.