{"title":"Robustness Analysis of Total Project Cost and Schedule Delay and Overrun Indicators of Heavy Industrial Projects","authors":"Sharareh Kermanshachi, Apurva Pamidimukkala","doi":"10.1061/jladah.ladr-942","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":46126,"journal":{"name":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","volume":"1 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/jladah.ladr-942","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"LAW","Score":null,"Total":0}