{"title":"Impact of Real Case Transmission Systems Constraints on Wind Power Operation","authors":"F. Vallée, J. Lobry, O. Deblecker","doi":"10.1002/ETEP.549","DOIUrl":null,"url":null,"abstract":"SUMMARY In this paper, a general strategy is proposed in order to introduce in a realistic way wind power into a HLII (bulk power system) nonsequential Monte Carlo adequacy study with economic dispatch. By use of the implemented solution, wind power can consequently be confronted to operational constraints related to high-powered thermal units, nuclear parks or cogeneration. Moreover, in order to optimize the large-scale integration of wind power production, the required reinforcements on a given electrical grid can also be evaluated on basis of the presented developments. The elaborated strategy can practically be applied to every kind of nonsequential Monte Carlo approach used to technically analyze a given transmission system. In the context of this work, the proposed solution has been implemented into the simulation tool Scanner# (property of Tractebel Engineering – Gaz de France – Suez company). Finally, in order to point out the efficiency and the usefulness of the proposed wind power model, the developed simulation tool has been firstly applied to an academic test system: the Roy Billinton test system (RBTS). Afterwards, in order to fully access the large offshore wind potential in the North Sea, the same tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network. Copyright # 2010 John Wiley & Sons, Ltd.","PeriodicalId":50474,"journal":{"name":"European Transactions on Electrical Power","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2011-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1002/ETEP.549","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Transactions on Electrical Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/ETEP.549","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

SUMMARY In this paper, a general strategy is proposed in order to introduce in a realistic way wind power into a HLII (bulk power system) nonsequential Monte Carlo adequacy study with economic dispatch. By use of the implemented solution, wind power can consequently be confronted to operational constraints related to high-powered thermal units, nuclear parks or cogeneration. Moreover, in order to optimize the large-scale integration of wind power production, the required reinforcements on a given electrical grid can also be evaluated on basis of the presented developments. The elaborated strategy can practically be applied to every kind of nonsequential Monte Carlo approach used to technically analyze a given transmission system. In the context of this work, the proposed solution has been implemented into the simulation tool Scanner# (property of Tractebel Engineering – Gaz de France – Suez company). Finally, in order to point out the efficiency and the usefulness of the proposed wind power model, the developed simulation tool has been firstly applied to an academic test system: the Roy Billinton test system (RBTS). Afterwards, in order to fully access the large offshore wind potential in the North Sea, the same tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network. Copyright # 2010 John Wiley & Sons, Ltd.
实际输电系统约束对风电运行的影响
本文提出了一种将风电实际引入具有经济调度的大容量电力系统非序贯蒙特卡洛充分性研究的一般策略。通过使用实施的解决方案,风力发电因此可以面对与大功率热电机组、核园区或热电联产有关的运行限制。此外,为了优化风电生产的大规模集成,还可以根据所提出的发展情况评估给定电网所需的加固。该策略可以实际应用于用于技术分析给定传输系统的各种非顺序蒙特卡罗方法。在这项工作的背景下,提出的解决方案已被实现到仿真工具Scanner# (Tractebel Engineering - Gaz de France - Suez公司的属性)中。最后,为了说明所提出的风力发电模型的有效性和实用性,将所开发的仿真工具首先应用于一个学术测试系统:罗伊比林顿测试系统(RBTS)。之后,为了充分利用北海的大型海上风电潜力,同样的工具被用于评估比利时输电网络所需的陆上增援。版权所有# 2010约翰威利父子有限公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
European Transactions on Electrical Power
European Transactions on Electrical Power 工程技术-工程:电子与电气
自引率
0.00%
发文量
0
审稿时长
5.4 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信