S. Kannan, P. Murugan
{"title":"Solutions to transmission constrained generation expansion planning using differential evolution","authors":"S. Kannan, P. Murugan","doi":"10.1002/ETEP.275","DOIUrl":null,"url":null,"abstract":"This paper describes the application of differential evolution (DE) technique for solving the transmission constrained generation expansion planning (TC-GEP) problem. The TC-GEP is a large scale and challenging problem for the decision makers (to decide upon site, capacity, type of fuel, etc.) as there exist a large number of combinations. The test system used is a modified IEEE-30 bus test system with a planning horizon of 6 years. The results are compared and validated with dynamic programming (DP). Copyright © 2008 John Wiley & Sons, Ltd.","PeriodicalId":50474,"journal":{"name":"European Transactions on Electrical Power","volume":"19 1","pages":"1033-1039"},"PeriodicalIF":0.0000,"publicationDate":"2009-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1002/ETEP.275","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Transactions on Electrical Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/ETEP.275","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11
基于差分进化的输电约束下发电扩展规划求解
本文介绍了差分进化技术在求解输电约束发电扩展规划(TC-GEP)问题中的应用。TC-GEP对于决策者来说是一个大规模且具有挑战性的问题(决定场地,容量,燃料类型等),因为存在大量的组合。测试系统采用改进型IEEE-30总线测试系统,规划周期为6年。用动态规划(DP)方法对结果进行了比较和验证。版权所有©2008 John Wiley & Sons, Ltd
本文章由计算机程序翻译,如有差异,请以英文原文为准。