Pathways to integrating paratransit and formal public transport: Case studies from Tshwane, South Africa

IF 4.6 3区 工程技术 Q1 ECONOMICS
Lesedi Mokoma, Christoffel Venter
{"title":"Pathways to integrating paratransit and formal public transport: Case studies from Tshwane, South Africa","authors":"Lesedi Mokoma,&nbsp;Christoffel Venter","doi":"10.1016/j.retrec.2023.101356","DOIUrl":null,"url":null,"abstract":"<div><p>At its core public transport integration is about the collaboration of actors. Collaboration is elusive and difficult to achieve, especially in developing countries where insufficient regulation and dispersed, quasi-formal public transport operations are common. Asymmetries in information and objectives between paratransit and formal sector actors create barriers and may prevent synergies from emerging. A simplified framework for assessing the collaboration of actors during the implementation of integrated public transport projects is proposed. The position of the framework is that it is critical to identify actors’ objectives and barriers to collaboration, and then to action decisions to remove these barriers and achieve objectives at every step of the STO (Strategic Tactical Operational) decision-making process to maintain structural and horizontal consistency. The framework is tested ex-post on two public transport integration projects in Tshwane, South Africa: the Gautrain regional rapid rail and A Re Yeng Bus Rapid Transit (BRT), both of which are supported by paratransit feeders. The case study shows how collaboration is achieved when all the key actors' objectives and barriers are understood, planned for and implemented across the STO levels and how failure to do so can lead to failed integration outcomes. The framework may be useful to authorities pursuing collaboration with paratransit for the purposes of implementing integrated public transport in the Global South.</p></div>","PeriodicalId":47810,"journal":{"name":"Research in Transportation Economics","volume":"102 ","pages":"Article 101356"},"PeriodicalIF":4.6000,"publicationDate":"2023-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Research in Transportation Economics","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0739885923000963","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 0

Abstract

At its core public transport integration is about the collaboration of actors. Collaboration is elusive and difficult to achieve, especially in developing countries where insufficient regulation and dispersed, quasi-formal public transport operations are common. Asymmetries in information and objectives between paratransit and formal sector actors create barriers and may prevent synergies from emerging. A simplified framework for assessing the collaboration of actors during the implementation of integrated public transport projects is proposed. The position of the framework is that it is critical to identify actors’ objectives and barriers to collaboration, and then to action decisions to remove these barriers and achieve objectives at every step of the STO (Strategic Tactical Operational) decision-making process to maintain structural and horizontal consistency. The framework is tested ex-post on two public transport integration projects in Tshwane, South Africa: the Gautrain regional rapid rail and A Re Yeng Bus Rapid Transit (BRT), both of which are supported by paratransit feeders. The case study shows how collaboration is achieved when all the key actors' objectives and barriers are understood, planned for and implemented across the STO levels and how failure to do so can lead to failed integration outcomes. The framework may be useful to authorities pursuing collaboration with paratransit for the purposes of implementing integrated public transport in the Global South.

将辅助交通和正式公共交通整合的途径:南非茨瓦内的案例研究
公共交通一体化的核心是参与者的合作。合作难以捉摸,难以实现,尤其是在发展中国家,监管不足和分散的准正规公共交通运营很常见。辅助翻译和正式部门行为者之间信息和目标的不对称造成了障碍,并可能阻碍协同作用的出现。提出了一个简化的框架,用于评估在实施综合公共交通项目期间行为者的合作。该框架的立场是,关键是要确定行动者的目标和合作障碍,然后采取行动决策,消除这些障碍,并在战略战术行动决策过程的每一步实现目标,以保持结构和水平的一致性。该框架在南非茨瓦内的两个公共交通一体化项目上进行了事后测试:高铁区域快速铁路和阿再阳快速公交(BRT),这两个项目都由副输电线支持。案例研究表明,当所有关键参与者的目标和障碍在STO层面上得到理解、规划和实施时,如何实现合作,以及不这样做会如何导致整合失败。该框架可能有助于当局与paratransit合作,在全球南方实施综合公共交通。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
8.40
自引率
2.60%
发文量
59
审稿时长
60 days
期刊介绍: Research in Transportation Economics is a journal devoted to the dissemination of high quality economics research in the field of transportation. The content covers a wide variety of topics relating to the economics aspects of transportation, government regulatory policies regarding transportation, and issues of concern to transportation industry planners. The unifying theme throughout the papers is the application of economic theory and/or applied economic methodologies to transportation questions.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信