{"title":"Multi-objective optimization models for the renewal planning of multiple asset classes","authors":"Thomas Ying-Jeh Chen,&nbsp;Eric Wang,&nbsp;Nicole Pasch,&nbsp;Amin Ganjidoost","doi":"10.1002/aws2.1336","DOIUrl":null,"url":null,"abstract":"<div>\n \n \n <section>\n \n <p>Managing the aging infrastructure of water distribution systems presents a challenge for many utilities. With various asset types competing for limited dollars, designing an effective asset management program is a resource allocation problem. Mobilization of equipment and crew is a significant cost (typically 2%–10%) within any capital improvement program. Therefore, selecting projects that target multiple asset classes together can reduce mobilization and help utilities stretch their budgets further. This research presents a process for modeling the joint renewal planning of multiple asset classes. The problem is framed as a dual-objective optimization, where the selection of project areas aims to maximize lead service line removal and water meter changeout together. A case study from a Midwest utility is presented, and empirical data suggests the dual-objective approach effectively reduces duplicate interventions in the same regions. Equity considerations are also examined, where constraints are added to enforce system-wide project selection. Results show that the sensitivity of the objective toward equity is dependent on the underlying spatial distribution of the target asset itself, where uneven spread of the target asset leads to greater negative impact on model performance.</p>\n </section>\n </div>","PeriodicalId":101301,"journal":{"name":"AWWA water science","volume":"5 2","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/aws2.1336","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AWWA water science","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/aws2.1336","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Managing the aging infrastructure of water distribution systems presents a challenge for many utilities. With various asset types competing for limited dollars, designing an effective asset management program is a resource allocation problem. Mobilization of equipment and crew is a significant cost (typically 2%–10%) within any capital improvement program. Therefore, selecting projects that target multiple asset classes together can reduce mobilization and help utilities stretch their budgets further. This research presents a process for modeling the joint renewal planning of multiple asset classes. The problem is framed as a dual-objective optimization, where the selection of project areas aims to maximize lead service line removal and water meter changeout together. A case study from a Midwest utility is presented, and empirical data suggests the dual-objective approach effectively reduces duplicate interventions in the same regions. Equity considerations are also examined, where constraints are added to enforce system-wide project selection. Results show that the sensitivity of the objective toward equity is dependent on the underlying spatial distribution of the target asset itself, where uneven spread of the target asset leads to greater negative impact on model performance.

多资产类别更新规划的多目标优化模型
管理老化的配水系统基础设施对许多公用事业公司来说是一项挑战。在各种资产类型争夺有限资金的情况下,设计一个有效的资产管理计划是一个资源分配问题。在任何资本改善计划中,设备和人员的调动都是一项巨大的成本(通常为2%-10%)。因此,选择同时针对多个资产类别的项目可以减少动员,并帮助公用事业公司进一步扩大预算。本研究提出了一个对多个资产类别的联合更新计划进行建模的过程。该问题被定义为一个双目标优化问题,其中项目区域的选择旨在最大限度地减少引线服务线和更换水表。一个中西部公用事业公司的案例研究表明,双目标方法有效地减少了同一地区的重复干预。还审查了公平考虑因素,其中增加了限制因素,以强制全系统项目选择。结果表明,目标对权益的敏感性取决于目标资产本身的潜在空间分布,其中目标资产的不均匀分布会对模型性能产生更大的负面影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.40
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信