Railway timetabling for the future? A pilot study on a single track line1

IF 2.6 Q3 TRANSPORTATION
Jan-Eric Nilsson, Per Olov Lindberg, Christina Gallner, Disa Asplund
{"title":"Railway timetabling for the future? A pilot study on a single track line1","authors":"Jan-Eric Nilsson,&nbsp;Per Olov Lindberg,&nbsp;Christina Gallner,&nbsp;Disa Asplund","doi":"10.1016/j.jrtpm.2023.100402","DOIUrl":null,"url":null,"abstract":"<div><p>No country uses optimisation methods to establish a value maximising allocation of operators’ demand for scarce railway infrastructure. Using the same input as was used in the year 2020 (T20), when the official timetable for one specific line in Sweden was developed by the infrastructure manager, this paper presents the outcome of the combined use of dual optimisation and rapid branching to produce a solution to an actual optimisation problem. These methods generate a timetable with the same number of trains as in T20 and some qualities that are better than those of the official timetable. The pilot study therefore confirms that it is worthwhile to further develop formal optimisation mechanisms towards larger-scale applications. Being able to handle conflicts-of-interest on a single-track line means that the problem on a double track line has fewer restrictions.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"27 ","pages":"Article 100402"},"PeriodicalIF":2.6000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Rail Transport Planning & Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2210970623000343","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 0

Abstract

No country uses optimisation methods to establish a value maximising allocation of operators’ demand for scarce railway infrastructure. Using the same input as was used in the year 2020 (T20), when the official timetable for one specific line in Sweden was developed by the infrastructure manager, this paper presents the outcome of the combined use of dual optimisation and rapid branching to produce a solution to an actual optimisation problem. These methods generate a timetable with the same number of trains as in T20 and some qualities that are better than those of the official timetable. The pilot study therefore confirms that it is worthwhile to further develop formal optimisation mechanisms towards larger-scale applications. Being able to handle conflicts-of-interest on a single-track line means that the problem on a double track line has fewer restrictions.

未来的铁路时刻表?对单轨线路的初步研究
没有哪个国家使用优化方法来建立运营商对稀缺铁路基础设施需求的价值最大化分配。使用与2020年(T20)相同的输入,当基础设施经理制定瑞典一条特定线路的官方时间表时,本文介绍了双重优化和快速分支相结合的结果,以产生实际优化问题的解决方案。这些方法生成的时刻表与T20中的列车数量相同,并且具有比官方时刻表更好的一些质量。因此,试点研究证实,有必要为更大规模的应用进一步开发正式的优化机制。能够处理单线上的利益冲突意味着双线上的问题限制较少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
7.10
自引率
8.10%
发文量
41
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信