Railway maintenance reservation scheduling considering detouring delays and maintenance demand

IF 2.6 Q3 TRANSPORTATION
B. Buurman, K. Gkiotsalitis, E.C. van Berkum
{"title":"Railway maintenance reservation scheduling considering detouring delays and maintenance demand","authors":"B. Buurman,&nbsp;K. Gkiotsalitis,&nbsp;E.C. van Berkum","doi":"10.1016/j.jrtpm.2022.100359","DOIUrl":null,"url":null,"abstract":"<div><p>Railway maintenance works are performed to reduce the probability of the occurrence of a failure on the components of the railway infrastructure. The scheduling of maintenance work is important in supporting the normal daily operation of the railway. By proper maintenance scheduling, operational hindrance in terms of extra travel costs due to detouring can be minimized. In addition, contractors can be given more space to execute maintenance activities with more flexibility. This study aims to optimize the maintenance schedules for both train operators and maintenance contractors by considering hindrance and flexibility for both stakeholders, respectively. This study tries to achieve this by modeling important factors contributing to both objectives and relevant constraints in a multi-objective optimization problem. The methods presented for solving the multi-objective model are the <span><math><mi>ɛ</mi></math></span>-constraint method and NSGA-II. Two path finding algorithms are modified to consider train travel limitations and are used to support the solutions methods. Both solution strategies are initially tested on fictive networks to analyze the performance. In a case study, the Dutch railway network is assessed and used to create new maintenance schedules based on the new model.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"25 ","pages":"Article 100359"},"PeriodicalIF":2.6000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Rail Transport Planning & Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2210970622000592","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 0

Abstract

Railway maintenance works are performed to reduce the probability of the occurrence of a failure on the components of the railway infrastructure. The scheduling of maintenance work is important in supporting the normal daily operation of the railway. By proper maintenance scheduling, operational hindrance in terms of extra travel costs due to detouring can be minimized. In addition, contractors can be given more space to execute maintenance activities with more flexibility. This study aims to optimize the maintenance schedules for both train operators and maintenance contractors by considering hindrance and flexibility for both stakeholders, respectively. This study tries to achieve this by modeling important factors contributing to both objectives and relevant constraints in a multi-objective optimization problem. The methods presented for solving the multi-objective model are the ɛ-constraint method and NSGA-II. Two path finding algorithms are modified to consider train travel limitations and are used to support the solutions methods. Both solution strategies are initially tested on fictive networks to analyze the performance. In a case study, the Dutch railway network is assessed and used to create new maintenance schedules based on the new model.

考虑绕行延误和维修需求的铁路维修预约调度
铁路维护工程旨在降低铁路基础设施部件发生故障的概率。维护工作的调度对于支持铁路的正常日常运营非常重要。通过适当的维护计划,可以最大限度地减少因绕行而造成的额外旅行成本方面的运营障碍。此外,承包商可以有更多的空间来执行更灵活的维护活动。本研究旨在通过分别考虑利益相关者的障碍和灵活性,优化列车运营商和维护承包商的维护时间表。本研究试图通过对多目标优化问题中对目标和相关约束的重要因素进行建模来实现这一点。提出了求解多目标模型的方法有约束法和NSGA-II。对两种路径查找算法进行了修改,以考虑列车行程限制,并用于支持求解方法。两种解决方案策略最初都在虚拟网络上进行了测试,以分析性能。在一个案例研究中,对荷兰铁路网进行了评估,并用于根据新模型制定新的维护时间表。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
7.10
自引率
8.10%
发文量
41
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信