Numerical Study on Mechanism and Parameters Optimization of Temporary Plugging by Particles in Wellbore

IF 1.4 4区 工程技术 Q2 ENGINEERING, PETROLEUM
Tao Zhang, Ming Li, Jianchun Guo, Haoran Gou, Kefan Mu
{"title":"Numerical Study on Mechanism and Parameters Optimization of Temporary Plugging by Particles in Wellbore","authors":"Tao Zhang, Ming Li, Jianchun Guo, Haoran Gou, Kefan Mu","doi":"10.2118/208585-pa","DOIUrl":null,"url":null,"abstract":"\n The temporary plugging by particles in the wellbore can open new perforation clusters and increase stimulated reservoir volume, but the temporary plugging process of particles is not clear. Therefore, in this paper, we take an ultradeep well in the Tarim Basin as the research object and establish a numerical model based on the coupled computational fluid dynamics-discrete element technology (CFD-DEM) approach, which accurately describes the movement process and mechanism of the temporary plugging particles in the wellbore. Furthermore, the influence of flow rate, concentration of injected particles, and the injected mass ratio of particle size on the temporary plugging effect were studied, respectively. In addition, based on the results of the orthogonal experimental analysis, we obtained the pump rate as the primary factor affecting the effect of temporary plugging, and we recommended the optimal operation parameters for temporary plugging by particles in the field: The pump rate is 2 m3/min, the concentration of the injected temporary plugging particles is 20%, and the ratio of the mass of the injected temporary plugging particles with particle size 1 to 5 mm to the mass of the temporary plugging particles with particle size 5 to 10 mm is 3:1. Finally, a single well that had implemented temporary plugging by particles was used to verify the recommended optimal temporary plugging operation parameters. The research results of this paper provide important guidance and suggestions for the design of temporary plugging schemes on the field.","PeriodicalId":22071,"journal":{"name":"Spe Production & Operations","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2021-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production & Operations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.2118/208585-pa","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 4

Abstract

The temporary plugging by particles in the wellbore can open new perforation clusters and increase stimulated reservoir volume, but the temporary plugging process of particles is not clear. Therefore, in this paper, we take an ultradeep well in the Tarim Basin as the research object and establish a numerical model based on the coupled computational fluid dynamics-discrete element technology (CFD-DEM) approach, which accurately describes the movement process and mechanism of the temporary plugging particles in the wellbore. Furthermore, the influence of flow rate, concentration of injected particles, and the injected mass ratio of particle size on the temporary plugging effect were studied, respectively. In addition, based on the results of the orthogonal experimental analysis, we obtained the pump rate as the primary factor affecting the effect of temporary plugging, and we recommended the optimal operation parameters for temporary plugging by particles in the field: The pump rate is 2 m3/min, the concentration of the injected temporary plugging particles is 20%, and the ratio of the mass of the injected temporary plugging particles with particle size 1 to 5 mm to the mass of the temporary plugging particles with particle size 5 to 10 mm is 3:1. Finally, a single well that had implemented temporary plugging by particles was used to verify the recommended optimal temporary plugging operation parameters. The research results of this paper provide important guidance and suggestions for the design of temporary plugging schemes on the field.
井筒颗粒暂堵机理及参数优化的数值研究
颗粒在井筒中的临时封堵可以打开新的射孔簇,增加受激储层体积,但颗粒的临时封堵过程尚不清楚。因此,本文以塔里木盆地的一口超深井为研究对象,建立了基于耦合计算流体力学离散元技术(CFD-DEM)的数值模型,准确描述了暂堵颗粒在井筒中的运动过程和机理。此外,还分别研究了流速、注入颗粒浓度和注入颗粒质量比对暂堵效果的影响。此外,基于正交实验分析的结果,我们得出了泵速是影响暂堵效果的主要因素,并在现场推荐了颗粒暂堵的最佳操作参数:泵速为2 m3/min,注入的临时堵塞颗粒的浓度为20%,粒径为1-5的注入的临时阻塞颗粒的质量比 mm至颗粒尺寸为5至10的临时堵塞颗粒的质量 mm为3:1。最后,以实施颗粒暂堵的单井为例,验证了推荐的最佳暂堵操作参数。本文的研究成果为现场临时封堵方案的设计提供了重要的指导和建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Spe Production & Operations
Spe Production & Operations 工程技术-工程:石油
CiteScore
3.70
自引率
8.30%
发文量
54
审稿时长
3 months
期刊介绍: SPE Production & Operations includes papers on production operations, artificial lift, downhole equipment, formation damage control, multiphase flow, workovers, stimulation, facility design and operations, water treatment, project management, construction methods and equipment, and related PFC systems and emerging technologies.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信