{"title":"Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance","authors":"R. Ahmed, Abrar Hussain, Simon P. Philbin","doi":"10.1080/10429247.2021.1940033","DOIUrl":null,"url":null,"abstract":"Abstract Schedule delays in construction projects are often a major concern and considered as a global phenomenon in the construction industry. In regards to project delivery, lack of senior management support is one of the main issues that impact project outcomes. This empirical research study aims to investigate the moderating effect of senior management support on the relationship between schedule delay factors and project performance. A questionnaire survey method was adopted to collect data from project directors, project managers, civil and construction engineers, project supervisors, and experts from small, medium, and large construction companies from major cities in Pakistan. A response rate of 84% was obtained based on 310 valid responses from a sample of 368 potential participants that received the survey. The cross-sectional data were used to test direct relationships and moderating effects through regression analysis and “process” method, respectively. The findings indicate that schedule delays in construction projects occur due to lack of commitment, insufficient site management, poor site coordination, lack of clarity in project scope, lack of communication and substandard contracts, in addition to major delays owing to improper planning. Moreover, the relationship between schedule delay factors and project performance is moderated by all dimensions of senior management support, i.e. providing resources, structural arrangements, communication, expertise, and power.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"34 1","pages":"374 - 393"},"PeriodicalIF":1.9000,"publicationDate":"2021-07-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/10429247.2021.1940033","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/10429247.2021.1940033","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 8
Abstract
Abstract Schedule delays in construction projects are often a major concern and considered as a global phenomenon in the construction industry. In regards to project delivery, lack of senior management support is one of the main issues that impact project outcomes. This empirical research study aims to investigate the moderating effect of senior management support on the relationship between schedule delay factors and project performance. A questionnaire survey method was adopted to collect data from project directors, project managers, civil and construction engineers, project supervisors, and experts from small, medium, and large construction companies from major cities in Pakistan. A response rate of 84% was obtained based on 310 valid responses from a sample of 368 potential participants that received the survey. The cross-sectional data were used to test direct relationships and moderating effects through regression analysis and “process” method, respectively. The findings indicate that schedule delays in construction projects occur due to lack of commitment, insufficient site management, poor site coordination, lack of clarity in project scope, lack of communication and substandard contracts, in addition to major delays owing to improper planning. Moreover, the relationship between schedule delay factors and project performance is moderated by all dimensions of senior management support, i.e. providing resources, structural arrangements, communication, expertise, and power.
期刊介绍:
EMJ is designed to provide practical, pertinent knowledge on the management of technology, technical professionals, and technical organizations. EMJ strives to provide value to the practice of engineering management and engineering managers. EMJ is an archival journal that facilitates both practitioners and university faculty in publishing useful articles. The primary focus is on articles that improve the practice of engineering management. To support the practice of engineering management, EMJ publishes papers within key engineering management content areas. EMJ Editors will continue to refine these areas to ensure they are aligned with the challenges faced by technical organizations and technical managers.