Issues of Improving Control and Increasing Efficiency of Production Blocks at an ISL Uranium Mine

Q3 Engineering
D. R. Podrezov
{"title":"Issues of Improving Control and Increasing Efficiency of Production Blocks at an ISL Uranium Mine","authors":"D. R. Podrezov","doi":"10.17073/2500-0632-2020-2-131-153","DOIUrl":null,"url":null,"abstract":"The tasks of continuous optimizing production, looking for ways of increasing performance, cutting mining costs and expanding mineral resource base of a mining enterprise are becoming more relevant than ever in conditions of the current negative trends at the world market of uranium resources. Increasing enterprise competitiveness requires permanent improvement of approaches and methods for managing performance of production blocks of a mine and ensuring the necessary volumes of reserves prepared for production. In the study, a theoretical information analysis of the process flow sheet of commercial ISL uranium production was carried out. The regression relationships between the main indicators of the production process cycles were determined, and the task of controlling production blocks at the stages of acidification, active leaching, completing operation, and decommissioning was formalized. The statistical characteristics of a production block cells and the distribution of uranium reserves, obtained based on the data of ore body drilling-in, as well as the analysis of the dynamic pattern of uranium production and recovery by production block depending on time, the balance of production block productivity by pregnant and leaching solutions enabled calculating key geotechnological indicators that formed the basis for calculating regression relationships between the uranium recovery and the ratio of the leaching solution amount to the rock mass amount, as well as for estimating specific consumption of sulfuric acid and electricity depending on operation time. This approach allowed identifying the problem areas and promising ways for improving the control procedure and performance of ISL mine wellfield operation. The planned measures will allow re-estimating resource potential of a production block while simultaneously providing a reasonable forecast of the residual uranium reserves in the being exploited and drilled-in blocks, reducing costs at the main development stage, and, by providing timely decommissioning of the blocks, reducing power consumption, optimizing sulfuric acid consumption, and overall improving quality of projecting and planning the production indicators for achieving uranium production targets. The study results can be used for improving short- and medium-term planning of technical and economic indicators of main development and production based on the forecast of ore interval sizes in production blocks that contributes to strengthening resource base and increasing capitalization of a company.","PeriodicalId":34147,"journal":{"name":"Gornye nauki i tekhnologii","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornye nauki i tekhnologii","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17073/2500-0632-2020-2-131-153","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

Abstract

The tasks of continuous optimizing production, looking for ways of increasing performance, cutting mining costs and expanding mineral resource base of a mining enterprise are becoming more relevant than ever in conditions of the current negative trends at the world market of uranium resources. Increasing enterprise competitiveness requires permanent improvement of approaches and methods for managing performance of production blocks of a mine and ensuring the necessary volumes of reserves prepared for production. In the study, a theoretical information analysis of the process flow sheet of commercial ISL uranium production was carried out. The regression relationships between the main indicators of the production process cycles were determined, and the task of controlling production blocks at the stages of acidification, active leaching, completing operation, and decommissioning was formalized. The statistical characteristics of a production block cells and the distribution of uranium reserves, obtained based on the data of ore body drilling-in, as well as the analysis of the dynamic pattern of uranium production and recovery by production block depending on time, the balance of production block productivity by pregnant and leaching solutions enabled calculating key geotechnological indicators that formed the basis for calculating regression relationships between the uranium recovery and the ratio of the leaching solution amount to the rock mass amount, as well as for estimating specific consumption of sulfuric acid and electricity depending on operation time. This approach allowed identifying the problem areas and promising ways for improving the control procedure and performance of ISL mine wellfield operation. The planned measures will allow re-estimating resource potential of a production block while simultaneously providing a reasonable forecast of the residual uranium reserves in the being exploited and drilled-in blocks, reducing costs at the main development stage, and, by providing timely decommissioning of the blocks, reducing power consumption, optimizing sulfuric acid consumption, and overall improving quality of projecting and planning the production indicators for achieving uranium production targets. The study results can be used for improving short- and medium-term planning of technical and economic indicators of main development and production based on the forecast of ore interval sizes in production blocks that contributes to strengthening resource base and increasing capitalization of a company.
ISL铀矿山提高生产区块控制和效率的几个问题
在当前世界铀资源市场出现负面趋势的情况下,采矿企业持续优化生产、寻找提高业绩的方法、降低采矿成本和扩大矿产资源基础的任务比以往任何时候都更加重要。提高企业竞争力需要永久改进管理矿山生产区块绩效的方法和方法,并确保为生产准备必要的储量。在本研究中,对商业ISL铀生产的工艺流程进行了理论信息分析。确定了生产工艺循环的主要指标之间的回归关系,并正式确定了在酸化、活性浸出、完成操作和退役阶段控制生产区块的任务。根据矿体钻探数据获得的生产区块单元的统计特征和铀储量的分布,以及对生产区块随时间的铀生产和回收动态模式的分析,怀孕溶液和浸出溶液的生产区块生产力的平衡使得能够计算关键的岩土技术指标,这些指标形成了计算铀回收率与浸出溶液量与岩体量之比之间的回归关系的基础,以及用于根据操作时间估计硫酸和电力的具体消耗。这种方法可以识别问题区域,并为改进ISL矿场作业的控制程序和性能提供有希望的方法。计划中的措施将允许重新估计生产区块的资源潜力,同时对正在开采和钻探的区块中的剩余铀储量进行合理预测,降低主要开发阶段的成本,并通过及时退役区块、降低功耗、优化硫酸消耗,全面提高预测和规划实现铀生产目标的生产指标的质量。研究结果可用于在预测生产区块矿段大小的基础上,改进主要开发生产技术经济指标的中短期规划,有助于加强资源基础,提高公司资本化水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Gornye nauki i tekhnologii
Gornye nauki i tekhnologii Chemical Engineering-Process Chemistry and Technology
CiteScore
3.00
自引率
0.00%
发文量
22
审稿时长
15 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信