Stakeholder management challenges and strategies for sustainability issues in megaprojects: case studies from Australia

IF 1.9 Q3 ENGINEERING, CIVIL
S. Senaratne, Abhishek Kc, Siryana Rai
{"title":"Stakeholder management challenges and strategies for sustainability issues in megaprojects: case studies from Australia","authors":"S. Senaratne, Abhishek Kc, Siryana Rai","doi":"10.1108/bepam-11-2022-0183","DOIUrl":null,"url":null,"abstract":"PurposeMegaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.Design/methodology/approachThis research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.FindingsEvery case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.Originality/valueThis research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-11-2022-0183","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeMegaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.Design/methodology/approachThis research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.FindingsEvery case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.Originality/valueThis research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.
大型项目中可持续发展问题的利益相关者管理挑战和策略:来自澳大利亚的案例研究
大型项目在财务上规模庞大,范围复杂,需要来自不同机构和社区的利益相关者的参与。随着利益相关者对可持续发展相关问题的关注日益增加,从环境到社会经济的角度来看,管理大型项目已经变得相当具有挑战性。因此,从项目开始就应该采取积极主动的方法,让利益相关者积极参与,以克服这些问题。目前,在管理可持续性问题的大型项目的特定利益相关者管理策略方面存在知识差距。设计/方法/方法本研究采用了案例研究中的二手数据,以确定悉尼地区大型项目中利益相关者管理的挑战和策略。通过使用NVivo软件进行定性内容分析和编码,收集与三个不同项目相关的文件,进行案例分析,然后采用主题方法进行跨案例分析。发现每个案例研究项目的可持续发展相关利益相关者问题的相似之处大于不同之处。差异主要在于某一特定项目中任何问题的影响强度,及/或任何项目某一阶段的影响强度。此外,还确定了管理环境和社会经济问题的重点部门和战略。无论采取何种策略,在大型项目中,他们都需要积极主动。原创性/价值本研究扩展了利益相关者管理的知识,涉及在大型项目的设计、建设和运营阶段管理与可持续性相关的问题。这项研究为大型项目的项目团队提供了有用的策略,以制定积极的利益相关者管理计划,解决不可避免的可持续性挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信