An Overview of EGS Development and Management Suggestions

Xin Liu
{"title":"An Overview of EGS Development and Management Suggestions","authors":"Xin Liu","doi":"10.30564/frae.v3i3.2452","DOIUrl":null,"url":null,"abstract":"The world is facing the energy challenge to over-reliance to fossil-fuels, the development of renewable energy is inevitable. From a clean and economic view, enhanced geothermal system (EGS) provides an effective mean to utilize geothermal energy to generate. Different form the conventionalhydro geothermal, the host rock of EGS is Hot Dry Rock (HDR), which buries deeper with high temperature (more than 180°C). The generationof EGS is promising. The development of EGS can be combined with the tech Power to geothermal energy. Exceed power is supposed to drive fluid working in HDR layer to obtain geothermal energy for generation. The whole article can be divided into three parts. In the first art, evaluation indexes of EGS as well as pilot EGs Projects (e.g. Fenton Hill and Basel) and exiting EGS project (e.g. Paralana and Newberry) are summarized, which points a general impression on EGS site. The dominate indexes are heat flow, geothermal gradient and thermal storage. The second part is focused on the simulation methods and working fluids selection of EGS. A detailed comparison of the main simulation software (e.g. TOUGH2 and FEHM) is carried out. With the respect of working fluid selection, the comparison between water and CO2 is researched and CO2 is a preferred option for EGS development for less fluid loss and less dissolution to HDR. The art of CO2-EGS is introduced clearly in this part. The third part is about the addition consideration of EGS plant operation, it excludes auxiliary plant support and HSE management.","PeriodicalId":64807,"journal":{"name":"建筑与工程前沿研究(英文)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"建筑与工程前沿研究(英文)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.30564/frae.v3i3.2452","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The world is facing the energy challenge to over-reliance to fossil-fuels, the development of renewable energy is inevitable. From a clean and economic view, enhanced geothermal system (EGS) provides an effective mean to utilize geothermal energy to generate. Different form the conventionalhydro geothermal, the host rock of EGS is Hot Dry Rock (HDR), which buries deeper with high temperature (more than 180°C). The generationof EGS is promising. The development of EGS can be combined with the tech Power to geothermal energy. Exceed power is supposed to drive fluid working in HDR layer to obtain geothermal energy for generation. The whole article can be divided into three parts. In the first art, evaluation indexes of EGS as well as pilot EGs Projects (e.g. Fenton Hill and Basel) and exiting EGS project (e.g. Paralana and Newberry) are summarized, which points a general impression on EGS site. The dominate indexes are heat flow, geothermal gradient and thermal storage. The second part is focused on the simulation methods and working fluids selection of EGS. A detailed comparison of the main simulation software (e.g. TOUGH2 and FEHM) is carried out. With the respect of working fluid selection, the comparison between water and CO2 is researched and CO2 is a preferred option for EGS development for less fluid loss and less dissolution to HDR. The art of CO2-EGS is introduced clearly in this part. The third part is about the addition consideration of EGS plant operation, it excludes auxiliary plant support and HSE management.
EGS发展综述及管理建议
世界正面临能源过度依赖化石燃料的挑战,发展可再生能源是不可避免的。从清洁和经济的角度来看,增强型地热系统(EGS)为利用地热能发电提供了一种有效的手段。与传统的水文地热不同,EGS的主岩是热干岩(HDR),它在高温(超过180°C)下埋得更深。EGS的产生是有希望的。EGS的发展可以与地热能发电技术相结合。Exceed功率被认为是驱动在HDR层中工作的流体,以获得用于发电的地热能。全文可分为三个部分。在第一部分中,总结了EGS的评估指标,以及试点EGS项目(如Fenton Hill和Basel)和退出EGS项目的评估指标(如Paralana和Newberry),这对EGS网站有着普遍的印象。主要指标为热流、地热梯度和储热。第二部分着重介绍了EGS的模拟方法和工作流体的选择。对主要仿真软件(如TOUGH2和FEHM)进行了详细的比较。在工作流体的选择方面,研究了水和CO2之间的比较,CO2是EGS开发的首选方案,可以减少流体损失和对HDR的溶解。本部分对二氧化碳EGS的技术进行了较为清晰的介绍。第三部分是EGS工厂运营的附加考虑,不包括辅助工厂支持和HSE管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
61
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信