{"title":"Risk management based on the best value approach and its application in conditions of the Czech Republic","authors":"P. Marvan, V. Hromádka, E. Vítková","doi":"10.1515/eng-2022-0438","DOIUrl":null,"url":null,"abstract":"Abstract This study focuses on the issue of the best value approach (BVA) method in the public procurement and on the European experience with the implementation of the BVA method, with a focus on the use of this method in the Czech Republic. The key topic here is the effort to manage the risks of the construction project already at the stage of preparation and tender for suppliers of construction works or services, namely, for public contracts evaluated through the BVA. The findings show that public procurement tenderers often misunderstand the concept of project risk as managerial, temporal, economic, or qualitative risk. Case studies show reserves and possibilities for improvement. The goal of the study is to provide a framework for understanding and explaining the principles and methods of evaluating a qualitative criterion in the form of the risk assessment plan.","PeriodicalId":19512,"journal":{"name":"Open Engineering","volume":" ","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Open Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/eng-2022-0438","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract This study focuses on the issue of the best value approach (BVA) method in the public procurement and on the European experience with the implementation of the BVA method, with a focus on the use of this method in the Czech Republic. The key topic here is the effort to manage the risks of the construction project already at the stage of preparation and tender for suppliers of construction works or services, namely, for public contracts evaluated through the BVA. The findings show that public procurement tenderers often misunderstand the concept of project risk as managerial, temporal, economic, or qualitative risk. Case studies show reserves and possibilities for improvement. The goal of the study is to provide a framework for understanding and explaining the principles and methods of evaluating a qualitative criterion in the form of the risk assessment plan.
期刊介绍:
Open Engineering publishes research results of wide interest in emerging interdisciplinary and traditional engineering fields, including: electrical and computer engineering, civil and environmental engineering, mechanical and aerospace engineering, material science and engineering. The journal is designed to facilitate the exchange of innovative and interdisciplinary ideas between researchers from different countries. Open Engineering is a peer-reviewed, English language journal. Researchers from non-English speaking regions are provided with free language correction by scientists who are native speakers. Additionally, each published article is widely promoted to researchers working in the same field.