PROJECT RISK AVOIDANCE AND PROJECT EXECUTION IN NIGERIA OIL AND GAS INDUSTRY [PENGHINDARAN RISIKO PROYEK DAN PELAKSANAAN PROYEK DI INDUSTRI MINYAK DAN GAS di NIGERIA]

Ike Egboga, Gift Worlu
{"title":"PROJECT RISK AVOIDANCE AND PROJECT EXECUTION IN NIGERIA OIL AND GAS INDUSTRY [PENGHINDARAN RISIKO PROYEK DAN PELAKSANAAN PROYEK DI INDUSTRI MINYAK DAN GAS di NIGERIA]","authors":"Ike Egboga, Gift Worlu","doi":"10.19166/DEREMA.V15I2.2581","DOIUrl":null,"url":null,"abstract":"This study sought to examine the relationship between project risk avoidance and project execution in the Nigerian oil and gas industry. Specifically, the study examined the relationship between project risk avoidance and four components of project execution (budget, quality, schedule and scope) among 51 oil and gas companies operating in Rivers State, Nigeria. To achieve this objective, 102 managing executives were given questionnaires, with 82 questionnaires correctly filled and returned. Data obtained were analysed using mean scores and Spearman’s rank order correlation analysis. The study found that projects risk avoidance was positively and significantly related to all four components of project execution. The main implication of this finding is that oil and gas companies need to invest heavily in innovative technologies and processes that will enhance their ability to avoid risk, thus improving the quality of projects they execute. Abstrak dalam Bahasa Indonesia. Studi ini berusaha untuk menguji hubungan antara proyek penghindaran risiko dan eksekusi proyek di industri minyak dan gas Nigeria. Secara spesifik, studi tersebut meneliti hubungan antara proyek penghindaran risiko dan empat komponen eksekusi proyek (anggaran, kualitas, jadwal dan ruang lingkup) di antara 51 perusahaan minyak dan gas yang beroperasi di Negara Bagian Rivers, Nigeria. Untuk mencapai tujuan ini, 102 eksekutif pelaksana diberikan kuesioner, dengan 82 kuesioner diisi dan dikembalikan dengan benar. Data yang diperoleh dianalisis menggunakan skor rata-rata dan analisis korelasi urutan peringkat Spearman. Studi tersebut menemukan bahwa penghindaran risiko proyek berhubungan positif dan signifikan dengan keempat komponen pelaksanaan proyek. Implikasi utama dari temuan ini adalah bahwa perusahaan minyak dan gas perlu berinvestasi besar-besaran dalam teknologi dan proses inovatif yang akan meningkatkan kemampuan mereka untuk menghindari risiko, sehingga meningkatkan kualitas proyek yang mereka jalankan.","PeriodicalId":31092,"journal":{"name":"DeReMa Development Research of Management Jurnal Manajemen","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"DeReMa Development Research of Management Jurnal Manajemen","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19166/DEREMA.V15I2.2581","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This study sought to examine the relationship between project risk avoidance and project execution in the Nigerian oil and gas industry. Specifically, the study examined the relationship between project risk avoidance and four components of project execution (budget, quality, schedule and scope) among 51 oil and gas companies operating in Rivers State, Nigeria. To achieve this objective, 102 managing executives were given questionnaires, with 82 questionnaires correctly filled and returned. Data obtained were analysed using mean scores and Spearman’s rank order correlation analysis. The study found that projects risk avoidance was positively and significantly related to all four components of project execution. The main implication of this finding is that oil and gas companies need to invest heavily in innovative technologies and processes that will enhance their ability to avoid risk, thus improving the quality of projects they execute. Abstrak dalam Bahasa Indonesia. Studi ini berusaha untuk menguji hubungan antara proyek penghindaran risiko dan eksekusi proyek di industri minyak dan gas Nigeria. Secara spesifik, studi tersebut meneliti hubungan antara proyek penghindaran risiko dan empat komponen eksekusi proyek (anggaran, kualitas, jadwal dan ruang lingkup) di antara 51 perusahaan minyak dan gas yang beroperasi di Negara Bagian Rivers, Nigeria. Untuk mencapai tujuan ini, 102 eksekutif pelaksana diberikan kuesioner, dengan 82 kuesioner diisi dan dikembalikan dengan benar. Data yang diperoleh dianalisis menggunakan skor rata-rata dan analisis korelasi urutan peringkat Spearman. Studi tersebut menemukan bahwa penghindaran risiko proyek berhubungan positif dan signifikan dengan keempat komponen pelaksanaan proyek. Implikasi utama dari temuan ini adalah bahwa perusahaan minyak dan gas perlu berinvestasi besar-besaran dalam teknologi dan proses inovatif yang akan meningkatkan kemampuan mereka untuk menghindari risiko, sehingga meningkatkan kualitas proyek yang mereka jalankan.
尼日利亚石油天然气行业的项目风险规避与项目执行
本研究旨在探讨尼日利亚油气行业项目风险规避与项目执行之间的关系。具体而言,该研究调查了在尼日利亚Rivers State运营的51家石油和天然气公司的项目风险规避与项目执行的四个组成部分(预算、质量、进度和范围)之间的关系。为了实现这一目标,102名管理人员获得了问卷,其中82份问卷正确填写并返回。所得数据采用均分和Spearman秩序相关分析进行分析。研究发现,项目风险规避与项目执行的四个组成部分都有显著的正相关关系。这一发现的主要含义是,石油和天然气公司需要大力投资创新技术和流程,以提高他们规避风险的能力,从而提高他们执行项目的质量。摘要:印尼语。尼日利亚石油天然气公司(尼日利亚)。Secara speifik, studi tersebut meneliti hubungan antara proyek penghindaran visiko dan empat komponen eksekusi proyek (anggaran, kualitas, jadwal dan ruang lingkup) di antara 51 perusahaan minyak dan gas yang beroperasi di Negara Bagian Rivers,尼日利亚。Untuk menapai tujuan ini, 102 eksekutif pelaksana diberikkan kuesioner, dengan 82 kuesioner diisi dan dikembalikan dengan benar。数据yang diperoleh di分析,menggunakan skor rata-rata dan分析,korelasi urutan peringkat Spearman。研究结果表明,该方法具有良好的临床应用价值,具有显著的临床应用价值,具有良好的临床应用价值。我的意思是,我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思是我的意思。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
14
审稿时长
20 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信