{"title":"Information System Project Development Management Ratio Set Assy GP Using Scrum Method","authors":"Muchammad Abdulloh Munib, A. Luthfi","doi":"10.51519/journalisi.v5i1.456","DOIUrl":null,"url":null,"abstract":"In April 2011, the term Industry 4.0 was introduced at the Hannover Fair. PT Yamaha Indonesia was an early adopter, implementing it in their piano manufacturing process. To achieve production targets, it is necessary to monitor the production series, including the assembly of piano components into a complete unit. SAP, a software platform, is used to improve efficiency, with one of its modules being K-STAFF, which has four derivative applications: K-Master, K-Ticket, K-Score, and K-Tiptop. However, the current production process is monitored through scanning input using a SAP derivative application, which is not visualized in the production area, leading to failed targets. To address this issue, a system is required to visualize input scan results to enable direct monitoring of the production process and achieve production targets. As a result, PT Yamaha Indonesia developed the Ratio Set Assy Grand Piano system using the SCRUM method. This system includes an MIS that monitors the ratio set of piano, visualized with Apache E-Charts, manages planning, and identifies priority spare parts in real-time. This research contributes to the development of a more efficient and effective production process","PeriodicalId":33075,"journal":{"name":"Journal of Information Systems and Informatics","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Information Systems and Informatics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51519/journalisi.v5i1.456","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In April 2011, the term Industry 4.0 was introduced at the Hannover Fair. PT Yamaha Indonesia was an early adopter, implementing it in their piano manufacturing process. To achieve production targets, it is necessary to monitor the production series, including the assembly of piano components into a complete unit. SAP, a software platform, is used to improve efficiency, with one of its modules being K-STAFF, which has four derivative applications: K-Master, K-Ticket, K-Score, and K-Tiptop. However, the current production process is monitored through scanning input using a SAP derivative application, which is not visualized in the production area, leading to failed targets. To address this issue, a system is required to visualize input scan results to enable direct monitoring of the production process and achieve production targets. As a result, PT Yamaha Indonesia developed the Ratio Set Assy Grand Piano system using the SCRUM method. This system includes an MIS that monitors the ratio set of piano, visualized with Apache E-Charts, manages planning, and identifies priority spare parts in real-time. This research contributes to the development of a more efficient and effective production process
2011年4月,“工业4.0”一词在汉诺威工业博览会上被引入。PT雅马哈印尼是一个早期的采用者,在他们的钢琴制造过程中实施。为了实现生产目标,有必要监控生产系列,包括钢琴部件组装成一个完整的单元。SAP是一个软件平台,用于提高效率,其中一个模块是K-STAFF,它有四个衍生应用程序:K-Master, K-Ticket, K-Score和K-Tiptop。然而,当前的生产过程是通过使用SAP衍生应用程序扫描输入来监控的,这在生产区域中是不可见的,导致目标失败。为了解决这个问题,需要一个系统将输入扫描结果可视化,以便直接监控生产过程并实现生产目标。因此,PT雅马哈印度尼西亚公司使用SCRUM方法开发了Ratio Set Assy Grand Piano系统。该系统包括一个管理信息系统,用于监控钢琴的比例集,使用Apache E-Charts进行可视化,管理计划,并实时识别优先备件。这项研究有助于开发更高效、更有效的生产过程